Jiading District, Shanghai, China
NVH and Tightness Department Air Borne Noise in Acoustic Package, Wind Noise, squeak and rattle 1. acoustic package strategy ,SEA simulation, PBNR target setting, cascading, design and tranfer path control powertrain/HVAC/tire/road noises,absorption treatment in interiors, vehicle test and validation 2. wind noise development, CFD simulation exterior design control, optimize VTS and test procedure, and sealing and tightness control, vehicle test and validation 3. component noise acoustic package treatment and protection 4. part squeak and rattle control, E-line analysis, CAD check and gap/material control, bench test, vehicle test and validation
NVH and Tightness Department Air Borne Noise in Acoustic Package, Wind Noise, squeak and rattle 1. acoustic package strategy ,SEA simulation, PBNR target setting, cascading, design and tranfer path control, vehicle test and validation 2. wind noise development, CFD simulation exterior design control, optimize VTS and test procedure, and sealing and tightness control, vehicle test and validation; wind noise team build up and and know-how improvement and sedimentation. 3. component noise acoustic package treatment and protection 4. part squeak and rattle control, E-line analysis, CAD check and gap/material control, bench test, vehicle test and validation
Squeak and Rattle, Airborne Noise in acoustic packages
Started from body parts release phase here. Mainly responsible for complete vehicle tightness related topics. 1. During development,by checking CAD data, tightness issue detection, root cause analysis, solution proposal, track issue and ECRs until implemented with detailed in body/ D&C/EXT/INT/ELE/HVAC/CHA/E-drive/EP modules 2. Specifically reponsible for technical requirement and setting design scheme of body expandable baffles/plugs/patches/adhesive/PVC sealant/body sealer. 3. Body connections and joints tightness target setting and issues solve 4. CV Parts/Sub-assembly/assembly tooling release approval 5. ECRs approval 6. Optimize VTS and cost reduction proposal 7. Tests executation and issues analysis and solution given , push and track to implemented 8. Pilot build launch support in body connection, gaps and adhesive issues resolve
Corrosion: Set CV anti-corrosion target; Cascading CV anti-corrosion target to MDTs' parts anti-corrosion specification; Make corrosion related CV DVP; Benchmark project competitors to control cost within budget and reach cost reduction; Collabration anti-corrosion work between Shanghai and Wuhu Chery; Collabration anti-corrosion alignment between Shanghai Chery and Qoros Changshu plant; Executive and follow up corrosion durability run test in Hainan; Issues analysis and reporting Tightness: Set tightness VTS target, revise tightness testing standards, 3D CAD virtual check for each DMR release, tightness DVP/ testing plan, Benchmark competitors tightness concept, executive tightness test and reporting
specify and order test objects(test vehicles) Create and follow up Program Verification Plan on a regular basis throughout the program. Create a verification plan that will secure the verification test delivery at each gate, milestone or event. Create and lead the activities concerning the test object plan per series throughout the complete program. Follow-up and report verification status on system and complete vehicle level. Support vehicle programs to achieve time, cost and quality targets; Support vehicle program gateway or milestone reviews and help to resolve program issues. Track testing vehicle status and location, track testing deliverables Create vehicle build requirements for mule phase and vehicle sharing requirements
In F35 project BMW, Follow up CV and body disassembly DYCO vehicle back from Hainan Proving Ground, find corrosion issues and root causes, make body corrosion report.
1.coordinate and plan team members on site work . 2. purchase and logistics coordinate for testing vehicle shipment and proving ground. 3. Support plant OQ water leakage detection. 4. Planning and tracking of validated testing vehicle plan. 5. Executive defined testing according to standard. 6. Evaluation and solution to detected issues during tests 7. Body shop and paint shop adhesive, PVC application status check and improvement recommendation. 8. Reporting and implementation.
1. test facility management. 2. Executive tests according to DVP. 3. Evaluation and solution to issues detected during tests. 4. IRS issues track and update in PLM system. 5. Changshu plant OQ water leakage support.