Ryan Yuen

Assistant Resident Engineer at Binnies

Hong Kong SAR

About

Experience

  • Assistant Resident Engineer at Binnies
    Oct 2023 - Dec 2025 · 2 yrs 3 mos

    Contract No. 2/WSD/21 Term Contract for Risk-Based Improvement of Water Mains - Hong Kong and Islands

  • Chun Wo Development Holdings Limited (Hong Kong SAR · On-site)
    • Site Engineer
      Feb 2023 - Oct 2023 · 9 mos

      Contract No. 1/WSD/19 In-situ Reprovisioning of Sha Tin Water Treatment Works – South Works – Advance Works and Main Works Contract No. 21/WSD/21 Relocation of Diamond Hill Fresh Water and Salt Water Service Reservoirs to Caverns

    • Graduate Engineer
      Jul 2019 - Feb 2023 · 3 yrs 8 mos

      Contract No. 1/WSD/19 In-situ Reprovisioning of Sha Tin Water Treatment Works – South Works – Advance Works and Main Works Contract No. 20180028 Foundation for Public Housing Development at North West Kowloon Reclamation (NWKR) Site 1 (East)

  • Assistant Engineer (Secondment) at Wong & Cheng Consulting Engineers Limited
    Aug 2021 - Aug 2022 · 1 yr 1 mo

    Contract No. 19-83009 Consultancy Services for Design of Trenchless Works and Provision of Category A&B Site Supervision for i)DAS-SYP-ZET 132kV Cable Circuit Improvement, ii)Kennedy Road near Yen Wah Steps to 44 Oi Kwan Road Contract No. 20-83006 Consultancy Services for Design and Provision of Category A&B Site Supervision for Trenchless Works in Tonnochy Road, Harcourt Road and Jaffe Road Contract No. BW218065 Term Geotechnical Engineering Consultancy Services for The University of Hong Kong (Five-year Term Contract) BD DH Order No.: DH0018/HK/20/C and DH0019/HK/20/C Slope Upgrading Works for Feature Nos. 11SW-A/R713 & 11SW-A/R714 at Bonham Road, Nos. 70 - 74 Pok Fu Lam Road, The University of Hong Kong - I.L. 8482 R.P. Proposed Re-construction of Fence Wall at No. 20 Shek O Road, Hong Kong - R.B.L. 266 and G.L. 72 S.J. Technical Feasibility Study for Redevelopment of Aberdeen Kai-fong Welfare Association Social Service Building (AKA)

  • Summer Internship at Chun Wo Development Holdings Limited
    Jun 2018 - Aug 2018 · 3 mos

    Contract No. 3/WSD/15 In-situ Reprovisioning of Shatin Water Treatment Works (South Works) - Advance Works