Romualdo "Robbot" Camarines

Business Development Manager

HMR Philippines, Inc. + 1 more · Adamson University

About

Experience

  • Business Development Manager at HMR Philippines, Inc.
    Jul 2025 - Present · 1 yr 5 mos

  • Managing Partner at Airtek Network Solutions Corp
    May 2024 - Present · 2 yrs 7 mos

  • Arvin International Marketing (8 yrs)
    • General Manager
      Jun 2016 - May 2024 · 8 yrs

    • Country Manager
      Dec 2017 - Jun 2023 · 5 yrs 7 mos

  • Procter & Gamble (23 yrs 1 mo)
    • Category Material Supply Leader
      Jan 2007 - Jan 2015 · 8 yrs 1 mo

      - Conducted/Technical Resource for VSM (Value Stream Mapping) for Internal (P&G) & External (Suppliers, CM) - Qualified Level 4 in WPI & VSM Capability - Cost & Cash Various Projects related to (Localization, Simplification, Inventory, Variances, Services, Headcount Reduction) - Achieved 8.7 SERPAT Audit - Launched Work Process Ownership for Supply Network Org.

    • Technical Team Leader (Detergent Bar Module)
      Jan 2004 - Jan 2007 · 3 yrs 1 mo

      - Complete rehabilitation of Plodders equipment. - Stabilized breakdown occurrence for Plodders/Mixers equipment. - Reduced equipment breakdown occurrences to single digit. versus average of 20 in the first quarter of fiscal year 05-06

    • Line Owner (Site Utilities/IBL Area 2/Wastewater)
      Jan 2000 - Jan 2004 · 4 yrs 1 mo

      - Contributed savings of USD91M, 479NPV,560% ROR for Bulk Powder System Project - Improved the wastewater system, savings realized of USD 27M, cost avoidance of USD 22M for fy03-04. Complied with the local government regulations. - Achieved 99.9% equipment availability for Power, Chilled Water, Potable and improved compressed air availability of 99.6% (Develop contingency plan for compressed air) - Promoted 3 engineers for the next e-level, transferred direct reports for some key positions in the plant. - Won 2 site awards for the BPS and wastewater cost savings projects - Launch/Lead in the Kaizen System in the Site

    • Reliability Owner (Syndet Bars Module)
      Jan 1999 - Jan 2000 · 1 yr 1 mo

      - Achieved 61% reduction of breakdown versus the base (97-98) - Received special appreciation award for the Breakdown Elimination System. - Developed capability for the site Breakdown elimination training course.

    • Team Operating System Owner (SB Line 2)
      May 1996 - Dec 1999 · 3 yrs 8 mos

      - Vertical start-up for Line 2 - Achieved PR 85% on CQV. Received “Strike Award” for achieving PR of 85% during the CQV - Develop capability for the new hires - Project involvement: SB Auto case packer - Promoted to E3 - Active member of Team.com (tapped by Melo and Yasu as emissary to Romy Policarpio) - Promoted to E4

    • Boiler/Genset Operator
      Jan 1992 - Apr 1996 · 4 yrs 4 mos

      - Start-up team of Boiler conversion from Coconut shell fuel- feed boiler to Bunker fuel-feed boiler. - Improve reliability of Pay loader operation. - Improved coco shell receiving sampling system. - Tide Ultra Start-up, Quality Control