HMR Philippines, Inc. + 1 more · Adamson University
- Conducted/Technical Resource for VSM (Value Stream Mapping) for Internal (P&G) & External (Suppliers, CM) - Qualified Level 4 in WPI & VSM Capability - Cost & Cash Various Projects related to (Localization, Simplification, Inventory, Variances, Services, Headcount Reduction) - Achieved 8.7 SERPAT Audit - Launched Work Process Ownership for Supply Network Org.
- Complete rehabilitation of Plodders equipment. - Stabilized breakdown occurrence for Plodders/Mixers equipment. - Reduced equipment breakdown occurrences to single digit. versus average of 20 in the first quarter of fiscal year 05-06
- Contributed savings of USD91M, 479NPV,560% ROR for Bulk Powder System Project - Improved the wastewater system, savings realized of USD 27M, cost avoidance of USD 22M for fy03-04. Complied with the local government regulations. - Achieved 99.9% equipment availability for Power, Chilled Water, Potable and improved compressed air availability of 99.6% (Develop contingency plan for compressed air) - Promoted 3 engineers for the next e-level, transferred direct reports for some key positions in the plant. - Won 2 site awards for the BPS and wastewater cost savings projects - Launch/Lead in the Kaizen System in the Site
- Achieved 61% reduction of breakdown versus the base (97-98) - Received special appreciation award for the Breakdown Elimination System. - Developed capability for the site Breakdown elimination training course.
- Vertical start-up for Line 2 - Achieved PR 85% on CQV. Received “Strike Award” for achieving PR of 85% during the CQV - Develop capability for the new hires - Project involvement: SB Auto case packer - Promoted to E3 - Active member of Team.com (tapped by Melo and Yasu as emissary to Romy Policarpio) - Promoted to E4
- Start-up team of Boiler conversion from Coconut shell fuel- feed boiler to Bunker fuel-feed boiler. - Improve reliability of Pay loader operation. - Improved coco shell receiving sampling system. - Tide Ultra Start-up, Quality Control