Jakarta, Jakarta, Indonesia
Executive Summary •Experienced in all facets of drilling and completion operations, land and offshore Deepwater (2100 mtrs), deep and shallow gas & oil wells. UBD/MPD, ERD, Insitu Gas lift completions, ESP pump Conversions, Geothermal, Level Three casing Drilling, and Deep HPHT wells •Drlg & completion of mining, Geothermal.Experience on Semi’s, floater’s, Jack Up’s & Inland barges, including Surface Stack Bop drilling (1100 meters water depth) Deepwater depth 2100 mtrs) in the Gulf of Mexico, India, UAE, Louisiana, Sicily, Qatar, Bahrain, Saudi Arabia, Asia, Java Sea, Brunei, Miri, Egypt lower & Upper Egypt, Indonesia-Timor Sea West Madura Offshore, Sulawesi, Cepu, Sumatra and Natuna Sea.Strong background in HSE •Vast Horizontal Exper. 7 years UBD in Austin chalk and Rocky Mountains – pressures while drilling 400 –2200 PSI –Reservoir Recovery while Drlg. •Level II & III CwD vertical up to 89.5 degrees ERD 20”,13 3/8, & 9 5/8 casing strings. Set 4 new world records for CwD in Indonesia •Vast experience in HPHT, CO2 and H2S environments including 5 Geo thermal well as a SDSV on HPHT Work in GOM, West Texas, South Texas, Egypt, Saudi, Oklahoma and Indonesia •Insitu Gas lift completions and ops, including ESP conversions •Shale Gas Drilling Barnett Shale, Bakken and Three forks. •Rigless ops, deepening and High Press snubbing •Published SPE papers Chairman and Co-Chairman SPE Egypt •K & M Schools for ERD, Lessons learned and risk evaluation •Team Leader for Bokor IPM/ Petronas Malaysia •From conceptual design to Operations activation for Inpex Abadi •Team Leader for Star Energy took a 3 year project dream of Star Energy. And in 3.5 months scoped, evaluated, & completed 42 contracts got operations on track. •Ops Supt. for a 743 million $ project for Pertamina. Conducted the RA & very instrumental in assigning & utilizing new technology with new hole opening while drilling & CwD with four New World Records set for CwD. World Wide Mentor and Coordinator for NeXt
Currently seeking other opportunities. Can work ground to crown
Drilling and Completions Advisor Oil and Gas and Geothermal
Currently seeking other opportunities and Challenges
Project Supervicor/Support for a 3 well workover program for SOL. Readied rig for operations, moved and set up same for Simops operations on a pad location. Worked over and cleaned out plugged injection well, cleaned out 1 well and set 2507 chrome 10 3/4 inch casing. Very tight and restricted location. Cleaned out and recovered lost coil tubing,
Assisted in Drilling pad wells with a 2000 HP walking rig wells drilled and finished in 8-12 dys to 19,000 feet. Released from work due to covid 19 issues and getting back home to Indonesia to my family
− Supervised the entire workover work on behalf of BGFCL − Prepared/finalized the detailed workover program, well data sheet, mud program, completing well logging, well completion and testing program and procedures and ensure that the proper procedures are followed and carried out the workover operation and that all equipment used were in good mechanical condition. Conducted all fishing operations utilizing the national rig contractor’s equipment and made several fishing items on location. Supervised all well testes on 8 wells successfully and handed over to production to sales lines. First time in the history of BGFCL well was worked over in less than 25 days most of the wells were 140 days prior to my entry into the program. − Ensured that the workover operation was carried out efficiently and safely.