Trabuco Canyon, California, United States
I lead the STV transportation structures group for highway, rail and transit projects in the Western United States. Current projects include Calif High Speed Rail CP-1 in Fresno, CHSR Anaheim-Burbank, LAX LAMP, SMART IOS 1, 1A and annual Bridge Inspections. SCRRA Metrolink On-Call.
Bridge Eng of Record for Cypress Ave OC of I-10/UPRR, TCA Windy Ridge Bridge widenings. Bridge Program Manager for Bakersfield TRIP. Deputy Bridge Program Manager SR-22 Widening.
Lead Bridge Eng for 5th Street Interchange over the SR-215 widening and BNSF Intermodal Yards.
Led the bridge team on projects including Caltrans Storm Damage Projects (SR-118 bridge replacement, Malibu PCH damage repair, Ventura sea wall and culvert repairs), Solana Beach Grade Separation redesign and construction, LA County Bridge Seismic Retrofits.
Bridge Design on SR-71, SR-74, SR-78, POLB Pico Ave Interchange @ 710, Navy Mole Bridge and MSE Walls. Caltrans D59 bridge seismic retrofits. Numerous APS's for Planning Studies.