Raymond Tung FCIHT MCIOB TCInstCES

Senior Quantity Surveyor BSc (Hon) FCIHT MCIOB TCInstCES MIHE MPWI

Wigan, England, United Kingdom

About

I am a Senior Quantity Surveyor with about 18 years of experience in project planning and implementation, project procurement, Management, cost control and analysis, contract management, and preparation of contract documents. Negotiated an agreement with subcontractors on-site and was involved in the ordering and procurement of materials

Experience

  • Senior Quantity Surveyor at Balfour Beatty plc

    SCAPE - Middlewich Eastern Bypass Preconstruction which the the employer is Cheshire East Council Scope of work: 3.1km of single carriageway, new bridge over the canal and one over the freight line and 5 Nos of culverts Contract type: NEC 3 Option C

  • Quantity Surveyor at Chun Wo Development Holdings Limited

    HK/2009/02 - Re-development of WSD Salt Water Pumping Station Scope of work: Construction of 4-storey high Salt Water Pumping Station for Water Supplies Department of Hong Kong Government

  • Senior Quantity Surveyor at Chevalier Group

    Project name: Residential Development of apartment for Long Ping MTR Station (North) (The Spectra) Scope of work: Construction of 4 residential building, each building 24-storey high providing 912 numbers of apartment with basement car park, 6-storey Elderly Care Centre and 2-storeys clubhouse

  • Project Quantity Surveyor at Chevalier Group

    On-Campus Expansion of Wanchai Campus of The Hong Kong Academy for Performing Arts, Wan Chai (Client: The Hong Kong Academy for Performing Arts)(HKAPA) Scope of work: Construction of a 9-storey high building block adjoining the existing Theatre Block for classrooms, studios, laboratories, music rooms, office, workshops

  • Senior Quantity Surveyor at Chun Wo Development Holdings Limited

    Project involved and QS-in-charge for the following projects: 1) Construction of multi-level carpark and footbridge at Hong Kong Jockey Club Scope of work: Construction of 3-storey level of car park for public use and a linked new footbridge connection with existing building and decoration work (addition and alteration work) of existing building 2) Construction of multi-level car park including basement at Yau Tong Scope of work: Construction of 2-storeys with 1-stoey basement car park (Construction site area: 8000m2) 3) Construction of public housing apartment including basement shopping Centre at Pak Tin Phase 11 Scope of work: Construction of 2 domestic blocks (Blocks 6 and 7) with 32-storeys and 2 non-domestic storeys for public use and 1-storey basement for shopping Centre 4) Construction of 30-storeys residential apartment building (The Luna) at Wan Chai Scope of work: Construction of a 27-storey high quality residential building including 23-storey residential tower, 1-storey high clubhouse and 3-storey high podium with shops and plant rooms.

  • Project Quantity Surveyor at Chun Wo Development Holdings Limited

    HK/2009/02 - Re-development of WSD Salt Water Pumping Station Scope of work: Construction of 4-storey high Salt Water Pumping Station for Water Supplies Department of Hong Kong Government

  • Assistant Quantity Surveyor at NISHIMATSU CONSTRUCTION CO.,LTD.

    Construction of Underground 11km Drainage Tunnel with 34 intakes to intercept stormwater at Hong Kong Island by using two Tunnel Boring Machine (TBM), diameter 7.2m and 8.3m.