Pierre Lefebvre

Offshore Project Engineer / Offshore Client Representative

Rogaland, Norway

About

Highly motivated, experienced and qualified Subsea Engineer with a demonstrated track record delivering EPCI, IRM and fast track projects in the North Sea and Africa for major clients. International experience with communication skills and capabilities of working effectively in multicultural environment. Strong technical and problem-solving skills with working well under pressure and excellent time management skills. Equally accustomed to work in a team and taking leadership for team coordination. Experienced and competent in offshore project execution and mobilizations, project and tender engineering and technical management of subcontractors. Experiences includes: subsea construction and IRM diving/ROV operations; installation of spools, flowlines and risers, jumpers and templates, Inter Array Cables, leading mobilizations, RFO / Precom support, inspection and maintenance

Experience

  • Technical Client Representative at Tullow Oil
    Jan 2023 - Oct 2023 · 10 mos

    • Jan 2023 – Oct 2023 Client: Tullow Oil (Ghana) Vessel: Skandi Africa Project: Jubilee South East Project (JSE) Field development including Load out of reels, RDS & Carousel onto HLVs in Houston, Newcastle, Kalundborg and Le Trait. In-country mobilisation in Takoradi Ghana. Installation of 3 Manifolds, 3 flowlines (2 PR & 1 WI), 5 Umbilicals, 6 Piles, various PLETS, Jumpers and Flying leads. Riser installation. RFO and commissioning. Surveys. Role: Technical Client Representative in charge of supervision of activities by subcontractor TFMC. Technical assessment of changes to approved procedures and reporting to head office. Supporting day shift and night shift client representatives along with maintaining high HSE standards onboard.

  • Senior Offshore Project Engineer at TechnipFMC
    Mar 2022 - Jan 2023 · 11 mos

    • March 2022 Client: Vår Energi Project: Balder-C Repair Vessel: Saturation Diving vessel - Deep Arctic Role: Project engineer for establishing barriers for divers, flowline disconnection (8’’ & 2,5’’), lift and shift, connection with grayloc in order to bypass a leaking XMT. • April - July 2022 Client: Equinor Project: Statfjord Øst Riser installation Vessel: North Sea Giant Role: Project engineer for the assembly & mobilisation of lay spread (chute, tensioner, MDL RDS, deflector) onboard North Sea Giant. Offshore engineer for the riser and flowline installation. • Sept – Oct 2022 Client: Equinor Project: IMR (Installation Maintenance and Repairs) Vessel: North Sea Giant. Role: Project engineer for the WLR clumpweight installation, LRT line installation, valve operation, inspection, suction anchor recovery & installation, balcony recovery, SHS wire change out and Åsgard Subsea Compression test lift of module. • Nov 2022 – Jan 2023 Client AQP (Egypt), Project North Idku Vessel: Deep Arctic. Role: Project engineer fot the installation of 7 clamps with air and saturation divers at various depths. Installation of a J-Tube alongside the NAFIII platform inside the clamps. Mobilisation & demobilisation of air diving spread onboard Deep Arctic. Concrete mattresses installation. Preparation for flowline pull in.

  • Shift Supervisor / Deputy Offshore Manager at LOUIS DREYFUS TRAVOCEAN
    Apr 2021 - Aug 2021 · 5 mos

    Project: Installation of 100km of inter array cables between 80 (6MW) Wind turbines in 12 strings. The parc du Banc de Guérande was the first offshore wind farm of France. Client: Consortium Parc du Banc de Guérande (PBG / Parc Eolien en mer de Saint Nazaire) vessel: CLV Olympic Triton & OSV Wind of Pride. Role: Shift Supervisor during the conversation and mobilisation of the Olympic Triton. The O. Triton was changed from a supply vessel into a cable lay vessel with a full mezzanine deck enabling storage of equipment below and cable handling above. Deputy Offshore Manager on board the Offshore Support Vessel Wind of Pride, in charge of vessel and personnel coordination between the Wind of Pride, CTV HST Sofia and the tower teams.

  • Senior Offshore Project Engineer at Ocean Installer
    Oct 2019 - Jul 2020 · 10 mos

    Askeladd project for Equinor Role: Transpooling site coordinator. Supervise & follow up of Subcontractors to transpool 60km of 4’’ MEG line onto 7 installation reels. Mobilization coordinator and offshore installation engineer for the installation of 2 manifolds, 4 PLETs, 4 spools and 12 GRP covers on the Askeladd field in Hammerfest Norway. Onboard Vessels: Island Victory & Norman vision on the Askeladd fieldm Norway. Base activities at Nordsea Bases in Stord and Hammerfest (Norway)

  • Offshore Project Engineer at DeepOcean
    Mar 2018 - Oct 2019 · 1 yr 8 mos

    Role: Project Engineer / mobilisation coordinator I ensure the mobilisation coordination towards our projects in Ghana by being part of the project team and supporting the logistic from Stavanger prior the campaigns. When the campaign approaches, I am in Ghana doing my best to make sure everything runs smooth, in a efficient and safe manner. Offshore I support the team as one of the 4 Project engineer. • March – Oct 2018, client Tullow UK, Riser 2 & Riser 4 Re-termination project, vessel: Polar Onyx. Recovery and re-termination of 2 off riser, redeployment and hang off to FPSO. • Nov 2018–April 2019, client Tullow UK, EN09 flowline installation, vessel: Polar Onyx. Transport and mobilisation of Reel and flowline from Denmark to Ghana. Installation, connection of the flowline between ILT and XMT and commissioning. • May – July 2019, client Tullow UK, EN16 flowline and Umbilical installation, vessel: Polar Onyx. Transport and mobilisation of flowline from Denmark and umbilical from Alabama US to Ghana. Mobilisation preparation and demobilization of RDS (reel drive system) equipment following a cancellation of the campaign.