Katy, Texas, United States
25 years progression: • Riser Life Extension SME • Project manager • Project technical manager • Lead project engineer • Offshore installation project engineer • Offshore installation analytical engineer • Riser design engineer Specialties: • Establishing and managing multi-discipline teams • Development of streamlined processes: historically reducing lost time from 4 days to 15 minutes per metrology map for subsea installation • Development of unique analytical tools: historically eliminating 8 days of lost time per rigid jumper fabrication and eliminating vessel standby time • Development of new BSEE guidelines for offshore risers: TTR refurbishments and riser life extensions
• Security Clearance: Public Trust • BSEE Riser Technical Authority, Riser Life Extension and Refurbishment Lead, BSEE Life Extension Team member (Pipeline, Office of Structural and Technical Support (OSTS) and TAS sections) • BSEE Policy development • Provide guidance to senior management for GOM riser issues, Operator Special Requests, Certified Verification Agent (CVA) and Independent Third Party (I3P) Report reviews, CVA/I3P interface • Review/Accept new technology applications • API RP 2RIM team member • Review/Accept Conceptual Plans, Deepwater Operations Plans (DWOPs), Supplemental DWOPs • Develop Statements of Work (SOW) for public solicitations; Member of two (2) Technical Proposal Evaluation Committees • Represent BSEE at industry workshops and forums • Industry Presentations - Riser Life Extension Requirements: Subsea Tieback Forum 2017, Deepwater Technical Symposium 2017, Flexible Pipe Forum 2018, Deepwater Technical Symposium 2018, 2023; • Other: Mentor junior personnel; Provide training to the TAS group.
• Engineering management/Project Manager, design, fabrication, installation and FEED planning and execution; Management of Change; Proposal development; Resource planning; Full Life-Cycle and Life Extension planning; • Strategy Leader – Diversification of services into non-O&G sectors; Developed an Offshore Wind Energy Team in coordination with SgurrEnergy US, China and UK; Principle Power Floating Wind Energy Platform Cost Review; • Project Manager: Hess Ceiba/Okume/Penn State Deep Remnant Life Analysis; Chevron Frade Redevelopment Project Riser Removal and Replacement Feasibility Study and Pull-In Validation Study; Shell Upstream Americas TTR Refurbishment and Delivery (Mars/Ram Powell); • Senior Staff Consultant: Lead installation engineer for Ichthyx mooring lines FEED study; Jumper Package Lead for BP Preparedness Response Strategy; Consultant - Marquix Pollution Control Membrane Concept. • CVA Project Manager: Shell Appomattox Design CVA for GE, OE, Service, WI and Production SCRs, Shell Olympus Installation CVA for OE and GE SCRs, Shell West Boreas Installation CVA for Production and OE SCRs; PAI Cascade Chinook Fabrication and Installation CVA for Chain Replacements, Slack Removal Units, and Backup Tethers;
• Engineering scope management - Project award to completion; Project team development; Technical management; Resource management; Client interface; Risk analysis; Contract Review • Technical Authority: Mobilization, installation and testing procedures for projects in excess of $50MM. • Technical Manager: Petrobras America Cascade/Chinook - Umbilicals, Flying Leads, Rigid Jumpers, Subsea Equipment; Chevron Tahiti - Rigid Jumpers; • Other: Auditor of ROV tooling division; Direct participation offshore for BP Macondo well monitoring/sampling.
• Mobilization, installation and testing procedures: subsea completions, tie-backs, umbilicals, flexible jumpers, spool piece and pipeline installations; • Performed subsea installation analysis; • Lead Engineer: Offshore/International Subsea installations; Pre-commissioning pigging and testing; ROV and hyperbaric diver operations; • Contractor supervision; Supply chain management; Risk analysis; Development of proposals;