The Hague, South Holland, Netherlands
Tank storage allrounder, met operationele en Maintenance werkervaring. Bekent met operationele werkprocessen als Shift leader. Ruime maintenance ervaring, opzet en implementatie MMS in Ultimo. Jaarplanning onderhoud. Uitbesteden van onderhoud en inspecties aan verschillende disciplines WTB, Civiele en FF assets. Project engineer mechanical and piping. Projectmatig inkopen van assets en equipment. PGS 29 en 31, Eemua 159, RBI opslagtanks, TBI pijpleidingen, NEN 3650 pijpleidingen. PED. BRZO.
Operations, Supporting the establishment of the operational organization, selection, and recruitment of operational personnel. Maintenance, Development and implementation of the Maintenance Management System in Ultimo, including the modules, work permits, purchasing, and payment. System built with a functional asset tree and tag numbers. Associated Document Management System, storage in the cloud. Setting up and implementing the RBI system for 54 new storage tanks in collaboration with Mistras. Setting up the TBI system for pipelines, including underground pipes NEN 3650/3655 and pressure equipment. Procurement support, Selecting suppliers for assets with cost justification, - Rotating equipment, pumps, and mixers - 2,800 automated valves - 25 loading arms - 5 gangways for sea-going vessels - Pigging systems - Tank equipment - Etc.
Purchase of tank storage equipment, tank measuring systems, pumps, valves, mixers and safety devices
HES Botlek Terminal Project team Expansion of the Tank terminal with 15 Storage tanks, seagoing jetty and Barge jetty with 2 berths. The total budget for this project is 70 million euros. Responsible for Piping, Mechanical and Fire Fighting installation. Purchase of piping and equipment, - Pipelines, 3D bends etc.. - Product pumps with fr.drive, MLA's 12" and 8" with power pack, valves, piglaunchers, tank mixers, safety equipment. - 2nd Fire Fighting Pump Set Engineering, - Piping Layout - Design for tank construction, walkways, stairs, nozzle orientation and connections. Activities - Installing the new pipelines to the tanks, pumps, sea quay and Barge Jetty, connecting on the existing pipelines - Placing and Installing 2nd VRU - Placing Marine Loading Arms - Fire Fighting cool and foam pipelines, extinguishing manifolds with valves and foam connection connect to existing FF installation. Knowledge of, - BOD - NoBo - Hazop - UPD - MTO - EEMUA - PGS 29 - Permits