Peter Malinowski

Retired at Home

Qatar

About

A Project Manager with thirty (30) years international experience on significant multi-discipline projects, specialising in business controls, project services and commercial management.

Experience

  • Retired at Home
    Dec 2018 - Present · 7 yrs 7 mos

  • Project Services Manager at Qatar Petroleum
    Nov 2015 - Present · 10 yrs 8 mos

    A full field redevelopment of a mature offshore oil field to offset declining production and ultimately increase capacity to approximately 75,000 bopd while extending field life for a further 30 years. The redevelopment involves two major projects (Phase 1 and Phase 2) and will involve drilling circa 140 new subsea wells, installation of 14 new and modification to 10 existing wellhead platforms, development of a new bridge linked offshore central processing complex with wet sour gas re-injection capability, and tie back to existing oil export facilities. The development involves full project front end loading and execution from concept optimization, through FEED, EPIC and decommissioning of the redundant facilities.

  • ConocoPhillips (10 yrs 7 mos)
    • Project Controls Manager / Project Office Manager
      Dec 2011 - Oct 2015 · 3 yrs 11 mos

      A Coal Seam Gas (CSG) Joint Venture between ConocoPhillips, Origin Energy and Sinopec to develop a 2 Train (nominal 9 Million Ton per annum) LNG facility on Curtis Island supported by an extensive gas gathering and processing infrastructure in Queensland Australia. The Upstream Project consisted of 9 Major Sub Projects engaged in drilling circa 1,000 wells, constructing fifteen trains of gas compression and 2 water treatment plants, an extensive gas gathering and telemetry network and over 500KM of main high pressure trunk pipeline linking the gas fields to the LNG Plant location.

    • Project Services Manager
      Apr 2005 - Nov 2011 · 6 yrs 8 mos

      A major capital investment involving the development and execution of a 2 train LNG plant with approx. 15 million tonnes per annum capacity and associated infrastructure and product export facilities in Qatar. The project included full FEED development, EPC execution and commissioning of the facility.

  • KBR, Inc. (12 yrs 11 mos)
    • Project Services Manager
      Jan 2001 - Mar 2005 · 4 yrs 3 mos

      An EPIC contract to supply a Floating Production Storage and Offloading Vessel (FPSO), Flexible Risers and Subsea Cables for ConocoPhilips Indonesia Inc. Belanak Field Development. The facility includes offshore oil, gas, and LPG processing and an integral storage capacity of 1 Million barrels of stabilised crude.

    • Project Controls Manager
      Oct 1998 - Dec 2000 · 2 yrs 3 mos

      Various corporate and engineering based project controls lead roles in Europe & Africa and Asia/Pacific region including Shapkino FEED and investigative audits in Russia and Algeria.

    • Project Controls Manager
      May 1992 - Oct 1998 · 6 yrs 6 mos

      Various Project Controls Lead roles at KBR's regional office and Middle East based projects such as Dukhan gas recycling project and Marjan Completion & Precommissioning Project.

  • Area/Program Manager at Johnson Controls
    Oct 1987 - Nov 1991 · 4 yrs 2 mos

    A 'Turnkey' Central Control & Monitoring (SCADA) System, with integrated Data Communications and Security applications for 26 Strategic defence installations in Saudi Arabia. This was a nominated subcontract of the USAF sponsored $5 Billion Peace Shield defence assistance program.