Greater Melbourne Area
Rail Design manager on major infrastructure projects and Track and Civil Team lead for Victoria Principal Permanent Way Engineer with skills and experience in Track design looking to develop further and to utilise current skills in various opportunities. Specialties: track alignment, cad, design, microstation, Permanent Way, Rail, pway, P'Way, track design, S&C, Plain Line, Network Rail, NR, Vline, ARTC, Bentley Railtrack Experience in all design stages; from Feasibility, Concept, Functional, Detail and Construction stages of design. Chartered Engineer in Civil and Project Management MTM - Track and civil designer, checker and approver
Design Area Manager for Western Section of Package 2 of Sunshine Super Hub. Covering Rail, Civil, Structural disciplines as a part of the bigger Sunshine Super Hub project. The enabler for Melbourne Airport Rail and Western upgrade plans
Design Manager for Southern Stabling Yard for Suburban Rail Loop tender for TransitLinX John Holland, ALSTOM, RATPDev, KBR, WSP, Egis, Hassell, TRACT
Passionate and dedicated Senior Permanent Way Engineer experienced in track design. International experience in U.K, Asia and Australia. Projects include: Caulfield to Dandenong - Level crossing Removal Projects Noble Park - Dandenong Inner and Outer Cluster Fast Track Proposal Grange and Poath Road, Grade Separation feasibility studies McKinnon and Centre Road, Grade Separation feasibility studies (Track Lead) - (for North Road Level Crossing Removal) Burke and North Road Grade Separation, Pre bid early works (Track Lead) Dandenong Transformation Project/Cranbourne Pakenham Rail Corridor Project – (Track Lead - Area 1) Murrumbeena Road Grade Separation Project, Melbourne (Track Lead) V/Line platform extensions, Victoria (Track Lead) Springvale Road Grade Separation Project, Melbourne (Senior Design Engineer) ERL depot, Singapore (Track Lead) Melbourne Freight Terminal, Australia (Track Lead) Experienced in working with government agencies, sub contractors and construction contractors in all stages of designs from: Feasibility, Concept, Functional, Detail and Construction Fully conversant in Microstation, Bentley Power Rail Track (RailTrack, InRail) Roadway Designer Working to VRIOGS, V/Line, ARTC, Pacific National, LTA, MTM and NR Standards
Track engineer with experience in track alignment design and working to V/Line, ARTC and VRIOGS track standards in Victoria. Project involvement include: South Morang Regional Rail Link Stabling Yards Cragieburn Train Maintenance Facility Several Passing Loops for ARTC ARTC S&C (P&C) renewals CAD packages used: Bentley RailTrack Select Series II Microstation Select Series II Roadway Designer (for Rail track design purposes)
Joined Jacobs Engineering as a Permanent Way engineer. - InRail user with experience with horizontal and vertical alignment design working on feasibility, renewal enhancement projects. - Microstation CAD used with 6 years experience in using CAD - ClearRoute user with experience in platform and structure gauging analysis - Multi discipline liaison with Civils, M&E, Signalling and Telecoms to ensure solutions and deliverables are met. Projects • Sussex station platform lengthening Tranche 2 GRIP 4 – Designing track alignment horizontal and vertical, drawing and report production for GRIP 4 • Oxford South bay Platform GRIP 4 – Track alignment design, drawing and report production for Form A submission for GRIP 4 Lite, Single option design to incorporate a bay platform at Oxford station. Horizontal and vertical track design of plain line and S&C. • NLRIP – Survey verification for North London Line Project • Wessex package B Platforms extensions GRIP 3 – Permanent Way feasibility and option selection studies for several station platform extensions and associated drawing production. Track alignment design and working with other disciplines. • Oxford Bay platform Grip stage 3 – P’way design and drawing production for initial carpark layouts. • Cotswold Line Enhancement Grip stage 3 – drawing production
Providing CAD support and P'Way design when necessary in the Form A and Form B levels for S&C projects, Private sidings, Loco yards. Assisting in Site surveys on London Underground and private sidings Projects Cooling the Tube project - London Underground Hope LaFarge - Private sidings enhancements Scotland Territory S&C Renewals (05-06) - Network Rail Scotland Territory S&C Renewals (06-07) - Network Rail Prior to current rail experience, Oliver's previous background was in the use of computer-aided design from an automotive engineering background.