Brossard, Quebec, Canada
Over 20 years’ experience in Oil & Gas Industry onshore, offshore, underground pipeline, shut-down, maintenance of petroleum refinery, Shipyards, marine conversions, integration modules, hook-up, regulation compliance, taking on roles of Planner, Quality Control, Construction, Commissioning and Start Up.
Project management and estimations of stainless steel pipe, fittings and spooling.
-Managing small project and developing/improving solutions for the construction of electric vehicles -Responsible to develop and implement and test a customized high-performance climate system for the vehicle -Responsible for tracking and reduce the cost of the projects -Analyze, clarify, interpret and align system requirements with other engineering disciplines to establish a common technical view -Define system concepts at the operational level based on the technical requirements of the project -Analyze air conditioning system failures (root cause analysis) and solve problems to quickly define and integrate the optimal solution considering application standards and regulations -Examine system interfaces and align communication and interference issues with other systems -Review relevant verification and validation (testing) plans to ensure compliance with the requirements -Prepare, review and support verification and validation activities relevant to the system -Support QA/QC with new parts and transition into production -Interpretation/Adequation and compliance with Canada Transport Standards for buses and trucks (CSA)
Customized inspection to fit the client's needs (TPI, ITP, QC plan, Industry Standards (ASME, API, ANSI, SOLAS, AWS, NORMAM) and customer requirements. -Management of contracts, resources, focal point and interface with customer representative, ensure compliance with contract; manage emergency situations, KPI report indicators; ensure quality in operations, services report. -Manufacturing, vendor, coating, pre-shipment, expediting, material, final inspection. -Witness hydrostatic test, Factory Acceptance Test (FAT), Mechanical Test. -Witness inspections and testing as per inspection test plans (ITP), quality plans, industry standards, supplier, and customer requirements. -Witness pressure vessel test as per NR-13 (Brazilian Regulation), carry out document review of data-books. -Provide support in projects or supply that needs Brazilian regulatory compliance (engineering design, manufacturing, inspection, tests, document review, data-book, dossiê, etc..) -Verify documentation, measurement, and equipment/instrument/valves calibration, check certificates as requirements. -Carry out fit-up, welding inspection, and review all required NDT reports as per ITP. -Witness/Evaluation of PWHT, WPS, and Welder Qualification. -Support for the preservation of equipment and material and inspection of spare parts. -Generate reports documenting rejection and acceptance of inspections and testing activities. -Overseeing the construction and installation of piping systems, ensuring adherence to industry standards, safety regulations, and project timelines -Providing technical support and guidance to other engineering disciplines and construction teams regarding piping systems and integration -Coordination with vendors, suppliers, and contractors to source materials, equipment, and services for the piping systems, ensuring quality and timely delivery -Inspection of the fuel tank, pump, hull, bilge of vessel as per requirements
Company representative to interface with Petrobras and COSCO Shipyard, in china, to carry on the conversion of 3 VLCC (Very Large Crude Carriers) into FPSO for production platforms P-75, P-76 and P-77 Lead construction, QA/QC/management team to ensure the compliance between the scope and specifications and Brazilian Standards -Ensure that activities be carried out safely in accordance with the requirements of HSE policies of the company; -Ensure that the activities are carried out as designed and every deviation are properly registered and approved by the client; -Analyze critical path and demonstrate new ways to planning and sequencing of priority activities; -Monitor and report the physical progress, demonstrating the main problems and possible solutions for mitigation; -Ensure that the resources necessary for performance of the activities planned to be available for execution; -Report weekly activities performed -Develop tests procedures and cleaning; -Draw up the technical documentation (dossiers, Checklist) for mechanical completion, Comm and Site Acceptance Test -Ensure that all equipment defined by project as NR-13 has a necessary documentation and carry on tests according to Brazilian regulation (dossiers, etc..) -Overseeing the construction and installation of piping systems and mechanical equipments (rotative and statics), ensuring adherence to industry standards, safety regulations, and project timelines -Providing technical support and guidance to other engineering disciplines and construction teams regarding piping systems and integration with equipments -Coordination with vendors, suppliers, and contractors to source materials, equipment, and services for the piping systems, ensuring quality and timely delivery -Ensure that the tests of systems, machines and equipment and preservation of equipment and systems are carried out in accordance with manufacturer’s recommendations/appropriate periodicity
Lead planning team during pre-award contract phase as: Assist bidding team to prepare/follow up the detailed schedule of BID;Process information between stakeholders (project team,estimators,procurement);Support procurement team to define main equip purchase strategy;Support for project schedule, budget and feasibility tendering;Adequacy of contractual standard to scope; Lead project management team during contract phase as: Participation of Kick-off meeting of contracts;Assist planning team to analyze and comment critical path of project schedule;Assist procurement team to carry on Factory Acceptance Test (FAT) at main suppliers;Monitor and report physical and budget progress (daily, weekly and monthly);Analyze, review and approve measurement bulletins subcontractors and issue information report;Highlighting schedule concerns/issues to ensuring mitigation or recovery plans are taking place;Monitor and ensure that fabrication, construction/commissioning activities (for boilers, water treatment, water cooling tower and utilities) are executed in accordance with service agreements and relevant codes/standards;Preparing, evaluate and analyse estimates for proposed changes/amendments/claims;Processing requests for quotes, contract amendments/changes;Assist and advise in negotiations to establish acceptable settlement of price and terms for changes and claims with subcontractors as well as coordinating support from other departments;Draft/review letters/memos regarding commercial/contractual matters;Provide written reports to management on problematic contracts;Processing documentation for contract close out; Main quantities - Construction and Commissioning of: of 3 new boilers with 370ton capacity of steam each of 1 Cooling Water tower with 15.000ton/h of water of 1 substation of 230kV and 30km transmission line of 1 substation of 69kV Gas insulated type of 6 new substations and expansion of 5 existent substation of 1 Craked Naphtha Hydrodessulphurization Unit