London, England, United Kingdom
Keen Engineer Assistant with seven years’ experience working on major tunnelling projects (Crossrail C305, Bank Station Capacity Upgrade and London Power Tunnel 2) in London. With my strong technical and communication skills, I am able to communicate effectively with audiences in diverse environments and clearly present complex information to non-specialised audiences. Both my academic and employment experiences have allowed me to develop excellent research and report writing skills, which I would be keen to utilize in my next role.
CAM Anglia and CAM Kent Framework – Network Rail project • Manage the interface with external or in house design teams on behalf of the Design Manager. • Liaise with other departments and project teams within the company with respect to design requirements. • Undertake site visits when appropriate. • Ensure that design work undertaken is carried out in accordance with company procedures and that a high level of professionalism is maintained. • Ensure that chargeable work is identified and evaluated including the preparation of adequate records of time spent. • Ensure that feedback on design work is collated and saved in accordance with procedure. • Prepare conceptual designs from with a view to the preparation of safe, practical and economic designs in accordance with current legislation. • Prepare detailed designs in accordance with current standards and codes including calculations, design risk assessments and sufficiently detailed sketches for the preparation of working drawings. • Check the design work of other staff members and external designers. • Summarise quantities relating to design tasks for pricing purposes. • Provide advice and guidance on design and operational issues. • Produce design or checking services to the requisite standards on behalf of the Company.
- Analysis and interpreting Geotechnical data - Preparing Damage Risk Assessment - Designing Retaining wall - Preparation of Ground Modelling summery sheets - Production of engineering design and details in accordance with project requirements - Preparation of design calculations, written reports - Visits to site (site inspection)
• Undertook weekly visual inspection of LU assets and Buildings (includes listed buildings, Grade 1 and Grade 2) within zone of influence of the tunnels and shafts. • Managed the status of relevant documentation to Installation and Monitoring department. • Ensured the I&M and Survey works are carried out in accordance with the design. • Maintained and updated asset trackers and programmes. • Conducted analysis I&M data for asset protection • Ensured monitoring data is current and relevant