NAIJU.G. MATHEW

Electrical inspector, 22 years of experience in the electrical industry

Dubai, United Arab Emirates

About

NAIJU.G. MATHEW ELECTRICAL ENGINEER OVERALL,22 YEARS OF EXPERIENCE IN THE ELECTRICAL INDUSTRY 2024- TILL Naiju G. Mathew is a Dubai Municipality-approved Electrical Inspector with 21 years of experience. He is currently employed with BC-3422 Water-UK in the United Arab Emirates, where he is involved in the DS203/2 Extension and Rehabilitation of the Warsan Sewage Treatment Plant – Urgent Works – Second Stage project. LARSEN AND TOUBRO LTD -QATAR I allocate tasks to the construction team and subcontractors, ensuring efficient resource management to maximize productivity. My role also involves reviewing test reports and collaborating closely with QA/QC teams to maintain high-quality standards throughout the project lifecycle. Additionally, I execute work according to drawings, making necessary adjustments based on site conditions, preparing red mark-ups, and as-built drawings, and submitting inspection requests as required LARSEN AND TOUBRO LTD -DUBAI 1/2/2018 - 7/10/2020 (DUBAI) I am responsible for efficiently allocating tasks to foremen and construction crews, ensuring optimal resource management to maximize productivity. My role involves close coordination with clients, design and engineering teams, and various disciplines, including Mechanical, Civil, and Instrumentation, to minimize rework during project execution. I manage the arrangement and control of consumables and client materials to optimize costs. Daily, I report work progress, front planning, and material requirements to the construction manager. My oversight includes the installation of transformers, MV VFDs, LV VFDs, MCC panels, LV panels, and control panels.

Experience

  • Electrical Inspector at Stantec
    Jul 2024 - Present · 2 yrs

    Naiju G. Mathew is an Electrical Inspector with 20 years of experience and is currently employed with BC-3422 Water-UK in the United Arab Emirates, working on the DS203/2 Extension and Rehabilitation of the Warsan Sewage Treatment Plant – Urgent Works – Second Stage.

  • Larsen & Toubro (Full-time · 6 yrs 6 mos)
    • Electrical Engineer
      Feb 2023 - Jun 2024 · 1 yr 5 mos

      THE INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS PHASE I (IIWWTW) Will Provide Treatment for Up To 10,000 Cubic Metres A Day of Tankered Industrial Wastewaters Arising from Light Industries Generated Within the Growing Doha Industrial Area Catchment.

    • Electrical team leader
      Jan 2018 - Mar 2023 · 5 yrs 3 mos

      UAE's biggest sewage treatment plant, jebel Ali STP, built by L&T -BESIX joint venture company "the 3,75,000 cum/day sewage treatment plant (STP) JEBEL ALI (PHASE 2), the biggest in the UAE, built by L&T for the DUBAI MUNICIPALITY

  • Electrical site supervisor at Al Mashariq Company
    Feb 2015 - Feb 2017 · 2 yrs 1 mo

    work allocation ,site reports,site safety and work supervision Controlling the unwanted expenses in the project and try to get maximum profit. • Generated pertinent Daily Reports like Progress, Financial etc., • Investigate the test reports and coordination with QA / QC to maintain the quality of work. • Ensuring that the work is carried as per the safety, quality standards and as per contract specification

  • ELECTRICAL FOREMAN at Larsen & Toubro
    Sep 2012 - Sep 2014 · 2 yrs 1 mo

    • • ELECTRICAL FOREMAN with LARSEN AND TOUBRO LTD QATAR (2012- TILL) • Execute the works as per drawing with the satisfaction of client. • Allocate the works to the constructions crews. • Controlling and managing the resources and get the maximum output. • Giving instructions to the subordinates and the approaching them in good comportment. • Manage and handling all issues in the site level and try to bring down the pressure on the top management. • Manage the staff like technical & non technical at site in a friendly manner and get the output maximum. • Controlling the unwanted expenses in the project and try to get maximum profit. • Generated pertinent Daily Reports like Progress, Financial etc., • Investigate the test reports and coordination with QA / QC to maintain the quality of work. • Ensuring that the work is carried as per the safety, quality standards and as per contract specification •

  • Electrical Supervisor at Mahindra Group
    May 2012 - Sep 2012 · 5 mos

    ring plant new mechine instalation work