Canada
• Responsible for all Engineering, Procurement, Logistic and Construction works for the overall Project. • Oversight of major equipment specifications, solicitations, and procurement. • Active knowledge of the Project contract scope, cost, schedule and terms & conditions. • Leading project internal meetings and external meetings with the Owner and BEDESCHI project management team, including presentations. • Coordination Project Status Reports including Engineering, Procurement, Project controls, and Construction • Choosing the Subcontractors and Vendors according the Project necessity. • Monitoring and tracking Process Engineering work completion • Making the Site Organization for the Construction Site activities. • Subcontractor monthly progress payment inspection and approval.
• Arrangement of the Proses flow sheet and general layout for new line • Determine of type of the equipments and prepare of equipment lists. • Prepare of Comprise table of the second line main equipments. • Prepare of tender documents of local construction company. • Technical meetings with equipment suppliers by the Medcem requirements for basic design • Checking to basic engineering drawing of equipment suppliers • Coordination with between to equipment supply companies with local engineering company for prepare of detail arrangement drawings. • Checking to detail arrangement drawings and section views according to basic engineering drawings. • Checking to static projects according to detail section drawings • Provide of all projects for construction company from Detail engineering company • Checking to workshops of local construction supplier for manufacturing. • Checking to investment progress according to Schedule • Coordination of between to Construction supplier and Supervisors of Equipment suppliers. • Structural steel Works • Site check, for all erection jops with my team • Manage major corrective maintenance actions, critical spare part and plant annual shutdown programs • Elaboration and control of the maintenance budget, ensuring planning and follow-up of costs • Lead planning for all foreseeable operations (weekly, master, shutdown) • Lead and improve the performance of the maintenance crews ensuring motivation, competencies and skills development to prepare successors
• Manage entire maintenance team, making sure each team member is efficiently and successfully filling maintenance team • Identify problems and quickly create solutions so production is not slowed or hampered • Perform daily repairs and ensure all production machines are in perfect working order. • Monitor machine efficiency, noting when fine tuning can be done to improve output and increase efficiency
• Production of tanks,piping steel construction • Supervise and responsible for the entire manufacturing facility and from incoming materials to exporting finished goods and its manufacturing cost. • Lead all associates in production operations with a focus on optimal productivity and high standards of quality. • Develop and implement policies improving the safety and productivity of the factory while taking into account employee safety and product quality. • Checked and examined all ordered items as to its construction, standards, machineries and factory capabilities. • Prepared a quarterly projection on plant capacity and related costs. • Ensured planned targets are attainable and will produce production at its maximum capacity at a minimum cost