Murat C.

Technical Office Manager at Teknokon Group

Kuwait

About

#industry, #refinery, #oil-gas, #project control, #cost control, #planning, #primavera Industrial construction professional with experience in HRSG boiler projects, planning, cost control, and site management. Experienced in coordinating multidisciplinary teams, monitoring project schedules, controlling budgets, and ensuring safe and efficient site operations. Strong background in EPC projects, progress tracking, reporting, and execution management within industrial energy facilities.

Experience

  • Technical Office&Planning Manager at Zack Power Systems Services Ltd
    Nov 2025 - Present · 9 mos

  • Teknokon Group (Full-time · 13 yrs 4 mos)
    • Teknik Ofis ve Planlama Müdürü
      May 2022 - Oct 2025 · 3 yrs 6 mos

      Türkiye Petrol Rafineleri A.Ş

    • Teknik Ofis Müdürü
      Jul 2021 - Apr 2022 · 10 mos

      Owner : Hugo Petersen GmbH Project Name : C7055 Bagfas, Absorption Group Project Manufacturing, delivery and installation of sulphuric acid plant equipment 1 Structual Steel - Fabrication and Installation with handrail,grating etc. 2.1 Piping Works # SX - Supply and Installation 2.2 Piping Works # FRP - Supply and Installation 2.3 Piping Works # SS - Supply and Installation 2.4 Piping Works- CS - Supply and Installation 2.5 Valve Installation 2.6 Instrument Installation 3.1 Equipment Manufacturing and Erection(Manufacturing of towers and installation with internal parts (ceramic etc.) 3.2 Duct Manufacturing and Erection 4 Insulation Works 5 E&I Works

    • Planlama ve Maliyet Kontrol Şefi
      May 2019 - Jun 2021 · 2 yrs 2 mos

      Owner: HZI AG and Makyol A.S Project: IMM Waste Incineration and Energy Generation Plant Işıklar / Eyüp / İstanbul