Mohamed Kotb

Project Management, Strategic Planning, Comprehensive budget, Financial forecasting, Business Performance analyses and Business Optimization projects. MBA, PMP, RMP.

Cairo, Egypt

About

With over 32 years of experience in project management within the oil and gas upstream facilities , in addition to the Strategic planning and Performance analyses since 2022 at Khalda Petroleum Company. Providing the Board with company comprehensive budgeting and financial forecasting insights, conducting detailed Operational performance analyses Driving business optimization projects with the concerned team to deliver solutions that empower operational excellence to enhance organizational performance. My expertise is supported by certifications such as PMP, RMP, and an MBA

Experience

  • Khalda Petroleum Company (Apache) (Egypt · On-site)
    • Strategic Planning and performance management
      Oct 2022 - Present · 3 yrs 9 mos

      Provide the board with the comprehensive budget and financial forecasting to support strategic decision-making. Conduct in-depth operational performance analyses to monitor and align with the company’s strategic objectives. Manage Business Optimization projects aimed at enhancing operational performance and driving continuous improvement.

    • Projects General Manager
      May 2020 - Oct 2022 · 2 yrs 6 mos

      - Manage the company projects portfolio for Oil and gas development. - Lead the team through the project life cycle from initiation, engineering, procurement, construction up to the commissioning and close out phase.

  • Project Manager at Tanmia Petroleum Company
    Oct 2018 - Apr 2020 · 1 yr 7 mos

    project manager and supporting the business development Prepare the technical and commercial proposal for several Oil and Gas projects

  • Khalda Petroleum Company (Apache) (Egypt · On-site)
    • Project Manager
      Jun 2010 - Sep 2018 · 8 yrs 4 mos

      - Special mention to the achievement in Kalabsha project as one of the major development projects within Khalda, to develop a remote area to be one of the main production facilities in the Western Desert with production capacity up to up 180,000 BFPD. - Kalabsha project was successfully executed in a nontraditional style within a crushed time frame and resulted in a remarkable befits not only from the early production but also supported Khalda to be ranked as top oil producer.

    • Construction Manager
      Nov 2001 - May 2010 · 8 yrs 7 mos

      • Southern Gas Pipe Line Project with $ 112 MM budget 214 Km Salam / Abu El Gharadig 18” export Gas buried pipe line, passing through Qatara Depression with different elevations up to 220 M, across 20 Km soft Sabkha and 60 Km sand dunes. . Upgrade of existing Oil facilities with additional equipment. • Three water injection facilities 60,000 BBLD capacity. • Two power stations16.5 MW capacity. • More than 500 Km of overhead power transmission network. • More than 1000 Km of flow lines. • Storage tanks and shipping facilities. • Workshops & Ware Houses, Roads and accommodation.

    • Lead Project Engineer
      Jul 1996 - Oct 2001 · 5 yrs 4 mos

      Western Desert gas Development EPC Project at $ 315 MM budget Comprises of 3 gas facilities 300 MMSCF capacity complete with related utilities and shipping network

  • Civil Engineer at Dolphin Energy
    Jan 2005 - Aug 2005 · 8 mos

    Near Shore 36” sea lines

  • Site Engineer at PETROJET
    Mar 1994 - Jun 1996 · 2 yrs 4 mos

    • Gaysoum onshore facilities • Ras Bakr 3 spherical storage tanks