Mikael F.

Head of Hardware Engineering

Lausanne Metropolitan Area

About

- Mixed signal high-performances HW design - FPGA, DSP, digital computing & systems simulations - VHDL, Matlab/Octave, Python, Java, C/C++, Linux - Altium Designer, Mentor PADS, Orcad, P-CAD - Mixed signal in-situ measurements & Debugging - Low level software architecture

Experience

  • Merging Technologies (Full-time · 10 yrs 2 mos)
    • Head of Hardware Engineering
      Jul 2023 - Present · 3 yrs

    • Hardware Engineer
      May 2016 - Present · 10 yrs 2 mos

      Hardware Engineer (Mixed signal hardware design, High performances PCB design, Mechanical integration) Low level system architecture FPGA/DSP Developer Test, Production & Validation

  • HES-SO Valais-Wallis (Sion)
    • Embedded HW-SW Engineer
      May 2014 - Jun 2016 · 2 yrs 2 mos

      - Assistant for Digital Electronics labs (Application of VHDL/HDL Designer/ModelSim) - Assistant for programming labs (JAVA/Excel/MATLAB)

    • Embedded HW-SW Engineer
      Aug 2014 - May 2016 · 1 yr 10 mos

      - CPPS (Centre pédagogique de prévention des séismes) project. - Network design and sismometer data logging - Low-level sensors interfacing

    • Embedded HW-SW Engineer
      Mar 2015 - Feb 2016 · 1 yr

      - Hardware design of Anemobox (prototyping and early commercial version) for Anemomind - http://www.anemomind.com/ - Low-level software design for peripheral access, board support package. Anemobox is a sailing dedicated data logger/sensing node exposing I/Os for wired communication and enables wireless Wifi and Bluetooth communication. Embedded peripheral overview: - On-board inertial station, temperature and barometer - On-board GPS - Low Power processing unit - NMEA2000/NMEA0183 communication - Wifi and Bluetooth connectivity - microSD storage - USB OTG and serial over USB - Low power

  • Employé at EMS St-François
    Jan 2009 - Aug 2013 · 4 yrs 8 mos

    Activité jour/nuit Surveillance des pensionnaires Soins de base Animations

  • Opérateur de production at Rio Tinto Alcan
    Jan 2008 - Aug 2008 · 8 mos