Mick McGrady

WHP. Optimisation

Greater Northampton Area, United Kingdom

About

Experience

  • None at WHP Wilkinson Helsby
    Jan 2015 - Present · 11 yrs 7 mos

    Optimisation

  • Site Superviser at Broadcast Australia
    Jan 2013 - Present · 13 yrs 7 mos

    Australias Anolog to Digital upgrade on the SBS Restack Project. Also High Tower Inspections (equipment,guys,guy tensioners and bases ect)

  • IMP Engineer at Alcatel Lucent Switzerland
    Mar 2012 - Dec 2012 · 10 mos

    IMP engineer configureing NEC MX,NEO Ericsson TN and Mini link E. Installing Lan cable to flexi and daisy chain multipal radios on Orange network so Supervision can be enabled over network.

  • Lead Engineer at AMODUS
    Jan 2012 - Feb 2012 · 2 mos

    Lead Engineer on E/// TN upgrades and installs on Orange Network. Cutting over of traffic and configureing crossconnects.

  • FIELD ENGINEER at T.JAMES TELECOMS
    Jan 2011 - Jan 2012 · 1 yr 1 mo

    this work was on mbnl project envolveing link swaps E1cut overs and DCN config To bring the flexi node into operation