Michael Wang

System Engineer at Northrop Grumman

El Segundo, California, United States

About

Experience

  • Northrop Grumman (Full-time · 9 yrs)
    • Senior Principal Systems Engineer
      Aug 2022 - Present · 4 yrs

    • Systems Engineering Manager
      Jun 2020 - Aug 2022 · 2 yrs 3 mos

    • Principal Engineer Systems
      Jul 2019 - Jun 2020 · 1 yr

  • Electrical Engineer at Boeing
    Aug 2015 - Aug 2017 · 2 yrs 1 mo

    • Electrical lead for multiple functional sections on vehicle • Perform root cause of failure analysis for controller communication issues across entire vehicle • Created, tested, and implemented upgrades to VHDL code for all controllers • Current lead on CPLD (Complex Programmable Logic Device) updates and designs for the vehicle • Generate new test plans, procedures, and technical reports to ensure conformance with engineering design and performance specifications to ensure requirements validation • Update and improve electrical designs and test procedures for future use and testing • Communicate daily with mechanical and software teams to support higher level testing and to advise on any matters regarding electrical systems or controller code • Complete rigorous test procedures and log data for future reference and confirming electrical system integrity

  • Summer Operations Analyst at Aon
    Jun 2014 - Aug 2014 · 3 mos

    • Aggregated key raw financial data from over 100 countries and generated global performance reports for AGCN management • Presented interpreted findings from over performance reports to Global COO of AGCN • Prepared revenue and premium numbers for specified clients at the direct request of the Global CEO of AGCN • Spearheaded and finalized excel template files and detailed guides for multiple statistics based internal monthly reports • Communicated directly with the CEO and COO for AGCN regarding requests for data, reports, and other small projects

  • Summer Enterprise Risk Management Analyst at AIG
    Jun 2013 - Aug 2013 · 3 mos

    • Created a new Risk Report which was planned to be distributed to regional Chief Risk Officers • Assisted the Stress Testing team with risk reports, audits, and direct requests from upper management • Collected shocked values at the direct request of the Chief Risk Officer of AIG P&C

  • Summer Intern at Ferra Designs Inc
    Jul 2012 - Aug 2012 · 2 mos

    • Participated in a ten person business, completing any requests such as assembling metal pieces to be used in future projects • Assisted in the preparation, maintenance, and installation of a new metal canopy for a Lower Manhattan Residential Building