Australia
Twin 750m Spur Tunnels and Caverns Road Header and HK LEM (Lining Erector Machine ) including but not limited to : EWP operations , Vent Can/Vent Bag extensions Haul Truck and Concrete Agi operations , Services extension . Setting up Robodrill CAT 525 Jumbo with Consumables ( 3m- 6m rock bolts, plates, and grout ) and replenishing as needed ( Loading Carousel) Cable bolts , Contact Groutjng ,install strip drains /dimple sheet . MSV Operator Segment Crane Operator Grouter Services Installation of Ableflex and Bullflex bag for Annullus
worked across many projects in NSW and interstate using various tunnelling methods (Auger Boring , Vermeer Axis Bore, Herrenknecht EPB TBM , AVN) site set up/ Mobilization and Demobilization . Loading and Unloading trucks. Getting the job done efficiently and safely.
Sydney Metro project Stage 2 -Marrickville to Barangaroo Cross Passage crew operating Excavators , Dieci Dumptruck (DP4200) and oversaw the sinking of 3x 4 meter shafts for Sumps in low points of the tunnel. Operating a small overhead gantry crane to load out material with a kibble bin . Maintenance and set up of Diaphragm pumps and dewatering tanks and service pipe extension . Installation of Dowels and Packers on precast concrete tunnel segments and loading of Ventilation bag onto Vent cassette for TBM . Demobilization of Steel Traversing modules for TBM .