Mehmet Bahadir Senturk

Quantity Surveyor, Cost Manager

Chester, England, United Kingdom

About

Diligent and resourceful Quantity Surveyor with a background in both civil engineering and architecture and possessing 10 years of experience. Being used to and enjoying to be part of international and productive teams in high-value projects. Highly skilled in implementing effective cost-control processes, budget management and contract administration. During my working experience I have worked in various positions of the cost control office (Two different international airport projects and two different residential and office mixed used projects.) In these positions, I took on tasks such as creating a construction site work schedule, signing contracts with subcontractors and making payments, efficiency of man-hours tracking and presentation to management (CPI, SPI).

Experience

  • Quantity Surveyor at ANT YAPI (UK) LIMITED
    Feb 2024 - Present · 2 yrs 5 mos

    Shotton Tissue Mill Project 1. Preparation of Invitation to Tender (ITT) Documents 2. Preparation of Subcontractor Documents in NEC4 Format Preparation of Contract Data. Preparation of Activity Schedule. Add specific clauses (known as Z clauses) to modify standard NEC4 terms to suit the project’s specific needs. 3. Managing Subcontractor Packages Performance Monitoring and Reporting Compensation event procedure management Payment management for subcontractors

  • Senior Tender Engineer at OKTA Construction
    Oct 2023 - Dec 2023 · 3 mos

    I took part in the tender preparations of two projects. The first project is a refurbishment of a luxury-class residential house in Chelsea, which includes demolition, external and internal works. In this project, we conducted our preparations according to the JCT contract. • Preparing full tender package of project, with preparation of detailed BOQ, • Detailed calculation and pricing of the new basement extension`s construction according to underpinning construction method • Calculation labor costs of internal demolitions and alterations • The presentation of final study prepared in accordance with the employer format The other project is a paper mill project located in Chester. In this project, my responsibilities were • Revision of the scope of the tender package for the finishing works, • Preparation of subcontractor tender packages, according to NEC4 Option B conditions.

  • Cost Control Manager at Almis llc
    Apr 2022 - Jul 2023 · 1 yr 4 mos

    Working as a manager of a busy team, taking responsibility for various projects at different stages. The workload includes 8 luxury-class residential blocks, a refurbishment residential block and a school project within the scope of urban renewal. The total area is 162 000 m2 with a budget of over $250m. • Preparing the direct and indirect budgets of the project • Producing quarterly reports & cash flow charts • Monitoring of the passive and active personnel ratios, calculating the cost impact and as a result of this analysis reducing the cost by $9m thanks to proportion of the passive personnel decreasing from %46 to 32. • Analysing of subcontractors' man-hours and monitoring their efficiency • Planning resources in terms of required equipment, manpower and materials • Organizing the staff members of the department to prepare weekly and monthly follow-up reports, offer comparison tables according to the commercial offer received from subcontractors, controlling the progress payment of subcontractors, progress payment documents for main contractor, casualty rate of materials and stock control.

  • Quantity Surveyor at Renaissance Construction
    Sep 2020 - Apr 2022 · 1 yr 8 mos

    Working for one of the top 10 construction companies in Europe as a quantity surveyor on a construction site. The workload includes a 5-star fit-out hotel project, shell & core office blocks and 5 luxury class residential blocks. • Revising the budget quarterly and comparing it with the initial budget • Preparation of claim documents and recovery from the client of approximately 90 percent of the financial losses resulting from increased labour and material costs and delays due to the coronavirus • Monitoring of passive and active personnel ratios, calculating the cost impact • Preparing the weekly and monthly follow-up reports • Monitoring casualty rate of materials and stock control • Creating a bid comparison table based on the commercial offers received from subcontractors and negotiating their offers in accordance with the budget prices • Organizing the construction purchasing process of the 5-star hotel project materials Headquarter of Renaissance Construction • Completed the training program about the cost office working principles, specialised database and software • Controlling the budget and monthly follow-up reports which were prepared by the technical offices of "Mega Teply Stan Shopping Centre" and "Lakhta Centre Fit-Out" projects

  • Ant Yapı (Moscow, Russian Federation)
    • Quantity Surveyor
      Apr 2019 - Sep 2020 · 1 yr 6 mos

      Tushino residential and sports complex • Measuring and evaluating site work and drawings for valuations and declaration of all files for progress payment procedures to the client • Preparing a comparison table based on the subcontractor's commercial offers, negotiating with subcontractors with the support of the cost office manager • Scheduled site teams to achieve timely project completion

    • Quantity Surveyor
      Apr 2018 - Apr 2019 · 1 yr 1 mo

      Domodedovo International Airport • Declaration of final accounts to the client • Preparation of additional tender packages for new zones and negotiations with the client • Revising the BOQ according to the added and removed jobs and their quantities