Maximillian Hansen

Naval Architecture | Quality Control | Shipyard Construction & Repair | Welding Inspection (ASNT Level II – MT, PT) | Welding Inspector

Nongsa, Riau Islands, Indonesia

About

Naval Architecture graduate with experience in shipyard projects (repair & new construction). Skilled in QA/QC, piping, mechanical systems, and welding inspection. Certified ASNT Level II (NDT-MT, PT). Proficient in AutoCAD & Microsoft Office. Passionate about quality and seeking opportunities in shipyard industry to grow and contribute

Experience

  • QC Inspector at PT Marcopolo Shipyard
    Oct 2025 - Present · 9 mos

  • QC Inspector at PT. Merah Putih Shipyard
    Aug 2024 - Jun 2025 · 11 mos

    Job Description : • Ensure all work carried out complies with International Instruction project Spec, fiction, Work Instruction, Procedure, and Manuals, as appropriate. • Perform in-process and final inspection on Hull and Outfitting in Workshop and onboard. • Perform internal inspections and lead to carrying out final survey and acceptance with Class and Owner. Coordinate and liaise with Classification Societies, Third Party inspects, Ship superintendents, and other trades, to ensure adherence to related standards. • Daily inspection reported for pre-fabrication, during fabrication, and after fabrication of hull construction. Include Materials and Equipment verification before installation. • Prepared the commissioning protocol, perform the test and witnessed commissioning with a third party on board, ensure all items procedure covering IMO mandatory convention adopted or Ship Certificate/Class Notation, and finally reported for approval Class and Owner. • Perform final visual inspection for underwater tanks/compartments, including shape deviation, welding discontinuities, structure, and outfitting arrangements.

  • Quality Control Engineer at PT. PANCARAN SAMUDERA SHIPYARD
    Aug 2022 - Dec 2022 · 5 mos

    Quality Control Repair • Melakukan Kalibrasi Rantai Jangkar Kapal • Melakukan tes kebocoran seperti : Penentrant Test, Vacuum Test, Air Pressure Test, Hydorstatic Test • Melakukan Ultrasonic Test (UT) • Melakukan Magnetic Particel Test • Melakukan Clearance check • Mengikuti Proses Balancing Propeller • Mengikuti Proses Lap Fitting Propeller/ Kontak Fit • Mengikuti Proses Deflection Shaft • Mengikuti Proses Sea Trial Kapal • Mengikuti Proses Megger Test Quality Control New Building • Melakukan Visual Inspection dan Fit Up Inspection pada proses pekerjaan bangunan baru • Melakukan Inclining Test