Matheus Carvalho Bianchi de Oliveira

Packaging & Supply Chain @Volvo Group | ex-Tesla, ex-BMW

Ghent, Flemish Region, Belgium

About

Engineering professional with 10 years of premium automotive industry experience (BMW, Tesla, Volvo). Specialized in Logistics Packaging Engineering (6+ years), Engineering Change Control, BOM management, and Total Vehicle Quality Control (4+ years), with additional experience in production and aftermarket supply chain and logistics. Passionate about problem-solving, creative solutions, and building strong collaborations that drive sustainable results.

Experience

  • Logistics Packaging Engineer at Volvo Group
    Jun 2024 - Present · 2 yrs 1 mo

  • Tesla (Tilburg, North Brabant, Netherlands · On-site)
    • Senior Packaging Engineer
      Mar 2024 - May 2024 · 3 mos

      • Responsible for packaging strategy and logistics packaging optimization initiatives across Tesla’s EMEA operations. • Delivered significant logistics partner cost reductions through packaging optimization, warehouse improvements, and operational alignment initiatives.

    • Packaging Engineer
      Dec 2022 - Feb 2024 · 1 yr 3 mos

      • Supported packaging operations across automotive, energy, and e-commerce warehousing, including HV battery and drive unit remanufacturing operations. • Achieved multimillion euro annual savings through service packaging optimization and logistics efficiency initiatives. • Managed end-to-end packaging planning, sourcing alignment, inventory governance, and operational coordination activities across EMEA operations.

  • Volvo Group (Full-time · 3 yrs 2 mos)
    • Packaging Engineer
      Jan 2021 - Nov 2022 · 1 yr 11 mos

      • Led restructuring of packaging area, combining resources from global and local organization in one roadmap. • Led top 10 South America packaging projects with Volvo’s biggest suppliers, reducing costs and lead-time. Responsible for coordinating actions with Purchasing, Supply Planning and Warehouse Operation, to achieve the goal of receiving parts already prepacked from the suppliers; • Reduced 7ton. of CO2/year and 75k USD/year by implementing usage of recycled plastic bags for all distribution center aftermarket parts, utilizing Volvo’s own plastic waste as a raw material; • 200K+ USD of inventory reduction at dealers, through packaging sales multiple review; • Member of GTO Global X-functional Talent project (cross functional potential talents nominated to present a project to solve Volvo’s Group greater challenges).

    • Packaging Analyst
      Oct 2019 - Dec 2020 · 1 yr 3 mos

      • 300k+ USD of savings and 10ton+ of CO2 reduction achieved with packaging improvements; • Over 400+ new packaging instructions created for new items, focused on improving quality, and reducing costs and lead-time; • Supported over 20 continuous improvement initiatives created by warehouse associates, creating quality and customer mindset within the operation.

  • BMW Group (5 yrs)
    • Engineering Change Control/Quality Analyst
      Jul 2017 - Sep 2019 · 2 yrs 3 mos

      • APQP coordinator responsible for G20 (New 3 Series) and F48 LCI (X1 Facelift), investigating over 200+ pre-series quality problems in Germany to avoid those problems before production in Brazil. • Successfully coordinated the implementation over 100 product deviations for models produced in Brazil to insure the original intent of the Technical Change. • Responsible for maintenance and accuracy of bill of material of all vehicles produced in Araquari in SAP. • Project leader of largest BMW plant event BMW Integrated Week (Quality, Environment, 4.0 Industry and Safety events merged into one event). Cost reduction initiative from BMW Brazil with over 600 participants.

    • Engineering Change Control/Quality Junior Analyst
      Jul 2015 - Jul 2017 · 2 yrs 1 mo

      • Total vehicle engineering change coordinator (engineering/DCN - Design Change Notice) for all models produced in Brazil. Responsible for communicating and controlling the introduction date of new DCNs across all areas; • Change Control representative for the segmentation project, that reduced 30% of lead-time, for items that needed import license; • SAP key user of Quality/Engineering area.

    • Plant Brazil Launch PMO
      Oct 2014 - Jul 2015 · 10 mos

      • Responsible for including, standardize and track all BMW Plant launch project (MS Project). • Create and report biweekly, launch project status for management committee. • Pricing adjustment for tryout parts releasing inside SAP.

  • Corporate PMO and Operations Management at Embraco
    Jul 2012 - Aug 2013 · 1 yr 2 mos

    • Support the implementation of Project Management Office Area (PMO) on all plants; • Corporate PMO, using PMI/PMBOK methodology, supported by MS Project software; • Develop, execute, and manage the Global Operations Meeting event, which took place in Brazil, during 2012, and had the goal of defining the future for the PMO area, at a global scale.