Martin du Toit

Senior Project Manager at LEO A DALY

United Arab Emirates

About

I like to solve problems. For more than 20 years I've been helping clients to achieve their goals in building design and architecture across Europe, the Middle-East and Africa. As a Project Manager, I've been able to build on my passion for excellence, overseeing the lifecycle of projects from design, engineering to construction and implementation. I'm proud of the incredible physical legacy I've been able to be a part of creating so far - from houses, to hospitals, hotels and shopping malls. I manage through communication and listening, always striving to build trust and crate strong working relationships with clients, consultants, colleagues and contractors. If you are looking for a design partner with the ability see the big picture, thinking ahead and anticipating “what comes next”, then I'd love to hear from you.

Experience

  • Senior Project Manager at LEO A DALY
    Dec 2020 - Present · 5 yrs 8 mos

    Project manage for Architecture & Planning & Healthcare Planning and Healthcare Construction & Technical Adviser Healthcare Construction. Consultant on Construction site. https://youtu.be/J2t9Fipkil0

  • TAHPI - A to Z of Health Planning (5 yrs 2 mos)
    • Associate Project Manager
      Jun 2016 - May 2021 · 5 yrs

      A leader in the design and build of the new Oncology Hospital (Comprehensive Cancer Care Centre) for the Sultan Qaboos University Hospital Muscat, Oman (SQCC). Responsible for coordinating the ongoing design, tenders, and construction information and inspections. SQCC is largely an outpatient orientated facility, comprising all major hospital departments including but not limited to: Radiation Oncology, comprising linear accelerators, brachytherapy bunkers, orthovoltage and gamma knife Chemotherapy. Medical Imaging and Nuclear Medicine. Operating Theatres and Endoscopy, for minor and day surgical procedures & outpatient consultation exam and treatment in three pods In addition, the facility will have extensive laboratory facilities including clinical labs, clinical trial labs, and research labs. Limited education facilities, and back-up facilities such as administration, food services, inpatient and outpatient pharmacies and facilities management are also provided.

    • Deputy Project Manager
      Apr 2016 - Jun 2016 · 3 mos

      Responsible for all management requirements for the relationship between ABVRock (Contractor) and the international health care, architectural and engineering design team. Management of these relationships involved a complex interplay between multiple companies and countries for the success of each project. These companies included: o Health Care Designer-Dubai o Architecture Designer-Dubai o Structural Engineering-Dubai and o Beirut and MEP-Dubai, Beirut and Manila • Responsible for all hospital design & development projects for the group • Given ultimate responsibility also as the dedicated liaison role between the design teams and the Client’s representative, Manens-Tifs. Key Project: The Security Forces Medical City • Design and build of the new medical hub for Saudi Arabia’s Minister of the Interior and the largest medical city being built in the Kingdom of Saudi Arabia. The agreement is a Design/Build contract under ABV Rock (Contractor). TAHPI was lead consultant for all design disciplines • Project cost: 12 Billion SAR (EU 2.5 Billion) and includes in a total of over 1.2 million square meters of built-up area and over 2.5 million square meters of land • The 500,000-square metre 12-story hospital includes 1300 inpatient beds, 46 operating theatres and is divided into hospitals for Adult Males, Women & Children, Mental Health and Rehabilitation • The campus also includes 18 utility buildings, 5 mosques, 6 helipads, and several thousand residential units with associated amenities\

  • TAHPI: Total Alliance Health Partners International ()
    • Associate Project Manager, Dubai
      Jun 2019 - Dec 2020 · 1 yr 7 mos

      Aman Hospital Doha (AHD), as above Children and Maternity Specialist hospital, consists of 27 000sqm, 101 beds. Responsible for Project Manage and coordinating of the commissioning team, that include the following services provided to the Hospital: o Clinical Service Planning, o Operational Policy Development, o Human Resource Planning & Recruitment, Book-keeping, o Accounting and Financial Planning, o Medical Equipment - Brand & Equipment selection and installation, o HIMS and Accounting System Selection, o Licensing, Marketing Strategy & Promotion, o Accreditation and Certification Services, o MEP Commissioning, o Staff Training & Dry Runs, o Hospital Clean & Pre-Opening, o Other Activities

    • Associate Project Manager, Dubai
      Jan 2019 - Dec 2020 · 2 yrs

      Aman Hospital Doha (AHD), this Children and Maternity Specialist hospital, consists of 27 000sqm, 101 beds and is the design of a new hospital within an existing structure, previously used as a motor showroom. • Responsible for Project Manage and coordinating of the ongoing design and tender phase for this 5-star Woman and Children hospital in Doha, Qatar, with specific reference to Client liaison, contract management and delivery on the program.

  • Senior Site Architect and Co-ordination Manager for Architecture at Mustang Al Hejailan Engineering (Mustang-HDP)
    Apr 2012 - Apr 2015 · 3 yrs 1 mo

    King Faisal Specialist Hospital Expansion Project Construction Project Management Consultant Cancer & Liver Diseases 20 storey Hospital, 84 000sqm, 300 beds Private Wing 5 storey Hospital, 13 000sqm Emergency Services 5 storey Hospital, 20 000sqm D-Wing 4 storey VIP Hospital, Internal revamp 8 500sqm Central Plant & Service Tunnel Landscape Development & Basement Parking

  • Senior Architect at HKR ARCHITECTS, DUBLIN, IRELAND (MARCH 2008 – MARCH 2009)
    Mar 2008 - Mar 2009 · 1 yr 1 mo

    Role: Senior Architect • Team size: 4x Architects &Technicians, 1x 3D Visualize • Overseeing the Architectural aspects: Lead the design team, Production/Technical team and oversee the construction documents and specifications • Interface with Client, Local Authorities, outside Consultants and Construction team Quantity Surveyor and Planners. • Delegate Team member assignments Projects • Thornton Hall Prison housing 500 people. • Independentei: Romania, Buchares: 5no. Tower mixed used development. Commercial, office & residential, hotel & apart-hotel. (109,460m²) • National Museum Ireland: Collins Barracks, Dublin. Senior Consultant to the Office of Public Works (OPW) Oversee the architectural drawings for the tender bid. (€70m.)