Mario Hein

Senior Projektleitung Tunnel + Geotechnik at IKK Group GmbH

Graz, Styria, Austria

About

Experience

  • Senior Projektleitung at IKK Group GmbH
    Sep 2025 - Present · 10 mos

  • Geotechnical Engineer (GTU) at Geoconsult Wien ZT GmbH
    Jun 2021 - Aug 2025 · 4 yrs 3 mos

    Lead Geotechnical Engineer at Semmering Basistunnel SBT 1.1

  • Geotechnical Engineer (GTU) at Geoconsult Wien ZT GmbH
    Apr 2019 - Apr 2021 · 2 yrs 1 mo

    Lead Geotechnical Engineer at the Tunnel Rudersdorf Project

  • Geoconsult Wien ZT GmbH (9 yrs 11 mos)
    • Geotechnical Engineer (GTU)
      Jul 2010 - Jan 2019 · 8 yrs 7 mos

      Geotechnical Engineer at the Koralm Railway Tunnel Project (Lot KAT1 and Kat2). Facts: ~2x5 km NATM, ~2x17 km TBM-drive (2 Hardrock-Doubleshield TBM, 9,93 m Diameter), ~60m deep Shaft

    • Tunnel Engineer
      Mar 2009 - Jul 2010 · 1 yr 5 mos

  • Engineer at Dr. G. Sauer Corporation
    Jul 2007 - Sep 2007 · 3 mos