Marek Cybulski

Senior Equipment Engineer Cell at Tesla

Berlin, Berlin, Germany

About

Experience

  • Tesla (Full-time · 5 yrs 3 mos)
    • Senior Equipment Engineer (Cell Winding Area)
      Apr 2023 - Present · 3 yrs 4 mos

    • Production Engineer Equipment (Cell Winding Area)
      May 2021 - Apr 2023 · 2 yrs

  • Senior Integrated Process Engineer at LG Chem Wrocław Energy Sp. z o.o.
    May 2020 - Apr 2021 · 1 yr

    -Solving complex production and quality problems -Comprehensive data analysis using statistical tools (SixSigma, SPC, MSA) -Participation in projects improving production capacity within machine park -Analysis of technological possibilities during implementation and commissioning production of prototype models of cells

  • Industrial Engineer (Launch) at Autoliv
    Nov 2019 - May 2020 · 7 mos

    -Specification and requirements prepration for new workstations and assembly lines -CAPEX Preparation -Determining and implementing corrective actions for PFMEA, AS403, complaints, internal problems -Creating / supervising the implementation of technical specifications for machines / production lines -Coordination of the machine / production line ordering process -Optimization of project costs -Implementation of new products to existing or new production lines. -Active participation in the work of the project team

  • Process and Production Engineer at Mobile Climate Control
    Jul 2018 - Nov 2019 · 1 yr 5 mos

    -Work within ERP Monitor System (BOM preparation, routing) -Process improvement of Metal-Shop Zone (Punching, Bending, SpotWelding, Welding) -Implementation of new work standards -Prototypes construction and its implementation to mass production -Implementation of new solutions to manufacturing line (workstations, machinery) -Creation of technical documentation (Inventor)

  • 3D Designer at ENWAR sp. z o.o.
    Mar 2017 - Jun 2018 · 1 yr 4 mos

    -3D design of manufacturing trolleys, technical documentation related to manufacturing trolleys prototypes and elements included in the production line e.g. workstations, protective elements, platforms, stairs, welded steel construction. -Prototypes construction and its implementation to mass production -Contact with external vendors (Production suppliers)