Mahmoud Essam Eldin

Supply Chain Manager @ Air Liquide | CLTD & CSCP

El Sheikh Zaid, Al Jizah, Egypt

About

Experience

  • Air Liquide (9 yrs 1 mo)
    • Industrial performance monitoring Manager AMEI
      Feb 2025 - Present · 1 yr 5 mos

    • Supply Chain transformation Manager
      Jan 2023 - Present · 3 yrs 6 mos

    • Logistics and distribution Manager
      Apr 2019 - Dec 2022 · 3 yrs 9 mos

  • EHS Engineer at NAFFCO
    Nov 2016 - Jun 2017 · 8 mos

  • EHS Engineer at PepsiCo
    Dec 2014 - Aug 2016 · 1 yr 9 mos

    Make weekly and monthly inspections for safety and occupational health and environment.  Getting involved in the risk assessment to make sure that all the workers are working in safe conditions.  Upgrading machine safety by using engineering solutions through a project based on the outcome of the risk assessment.  Lead the change of visualization by being responsible on the visualization project in the Plant.  Responsible for the safety Capex in chipsy 6th October Plant.  Follow up the standard specifications of the company files (GEHSMS) and follow up their implementation and participated in their audits.  Making safety and occupational health and the environment trainings on a regular basis.  Compile suggestions from all departments, and implementation of effective participation, and implementation of the monitoring program behavior program.  Preparation and following-up reports for Track system and monthly audits

  • Design Engineer at Indeco
    Mar 2014 - Dec 2014 · 10 mos

    Designing machines that work in the fields of agriculture and recycling.  Make sure that the design comply with working conditions and fulfill all the customer needs and making all the modifications if needed.  Making stress analysis for each component to make sure that each component is going to work effectively and will not fail.  Identifying the suitable material for each component that will be manufactured and buying the suitable parts that can’t be manufactured.  Supervising the manufacturing process and make sure that it is being held according to the design and with right sequence.  Make sure that the project is following the time schedule.

  • Trainee at Egypt Air
    Sep 2012 - Sep 2012 · 1 mo

    Introduced to the different parts of the plane and how it works, Attended the maintenance of the engines of the plane, Attended the tests that are done on the different parts of the plane before it takes off.