Madhu Sudan Sharma

Project Head ( Aramco Project)

Riyadh, Saudi Arabia

About

. Almost 23+ years of extensive experience I have a Good Knowledge in APIQ1 , ISO ,4G & 4F ,D1.1, ,7L,7K,8B, APIRP572,16A, 6A ,4G and 16C. ASME sec XI , ASTM ,API B31.1,API B31.3,API B31.4, API B31.8, API 1104 API B31.6 standard requirement i now that Piping, Structural and supervisory job for construction and fabrication, Quality Assurance and Quality control with emphasis on Inspection , documentation and Testing of various steel structures For pressure vessel , Oil and Gas field, Welding inspection , Hydraulic testing , pipe fitting inspections, and NDT testing inspection Plan and welding reports ,WQT Updated and PQR review ITP Review , NDT testing report review . proof load testing Supervision. Proof Load Testing, Manifold hi Pressure testing witness, rotary horse pipe testing witness and mud tank testing witness. must Structure Derrick erection supervision. Drilling rig mud system complete painting Inspection as per quaint requirement standard ETC

Experience

  • Project Head at Lifcon - Life Connection Contracting Co Ltd.
    Nov 2025 - May 2026 · 7 mos

    Aramco Projects, Pipeline & Piping HDD pulling 72inch and 56 carrier , 24 inch pulling 24inch Gas Arabia Project.

  • Vice President of Construction & Engineering at NMR Engineering & Works Pvt Ltd
    May 2025 - Oct 2025 · 6 mos

    7500 Cr + 450 cr Project P25 Tanks fabrication 16 , piping /Structure Static Equipments client IOCL ,PMC EIL , & Nafta cracker Expansion Project /Technip/IOCL.

  • CORRTECH ENERGY LIMITED (On-site)
    • General Manager (Site PM)
      Apr 2023 - Jul 2025 · 2 yrs 4 mos

      GCPL NFFE Project, UG & AG Piping, jatty Piping and Storage Tank ,Electrical & Instruments,Civil ,Painting/ Insulation

    • Project Manager
      Apr 2023 - Dec 2024 · 1 yr 9 mos

      Client 'IOCL (PMC -ThyssenKrupp) Panipat Naphta cracker expansion project. ERU unit Piping UG,AG ,Equipment instalation Rotary ,Pumps ,Static/insulation /Painting /Catalyst Loading in drier, Reactor ,Column. 2500 Manpower handling, Reporting 50 Manpower.

  • Regional Construction Manager at Adorn Infra Energy Pvt. Ltd.
    Apr 2022 - Feb 2023 · 11 mos

    KGPL Project Cross country 56 KM LPG Pipeline 12.75" IOCL PMC (Client - IHB)

  • Project Manager at J&A Engineering Pvt Ltd
    Jan 2022 - Apr 2022 · 4 mos

    mainline work and HDD work plan and monitor the project all activities and cordinate the team CGD