France
Grown in an industrial construction environment since 2001. Proud having worked in some of most complex projects worldwide mainly in Middle East and Arctic Russia. Believing in team work and firmly convinced that people life have much more value than any business on earth.
Project: Yamal LNG Type: Modularized LNG in Artic Condition Location: Construction Site at Sabetta - Russia Client: Yamal LNG (Total/Novatek JV) http://yamallng.ru/en/ http://www.total.com/en/energy-expertise/projects/oil-gas/lng/yamal-lng-cold-environment-gas Subcontractors: Mammoet, Velesstroy, Nova As LNG Trains General Superintendent my main duty is to provide the maximum support to the Trains Site Manager and Plant Site Manager in the daily coordination activity between different Subcontractors for construction of the core process parts of the plant (Train 1, 2 & 3). This task mainly include: - Coordination of all Disciplines Superintendents - Medium/short terms planning of the construction activities jointly with all Subcontractors - Coordinate the preparation activities for the Maga-Module receiving - Controlling and ensuring the fulfillment the usual Technip higher Safety and Quality Standards - Ensure a correct and regular reporting to the management and to the Client
Region: Corporate Department: Construction Method Center Location Abu Dhabi within Technip France/Abu Dhabi organization Job description: Coordination of a pool of Engineers with construction background providing: • Support to all Technip Projects (all Regions) mainly consisting in: o Leading Constructability Workshop o Piping Preaf/Erection Procedure and Studies o In house Spooling Activity o Lifting Studies and Method Statements o Heavy transportation Studies and Procedure o Onshore and Offshore Construction Execution Plans o Multidisciplinary Mhrs estimation of construction activities o Evaluation of risks and contains of a single or different construction solutions • Support the Corporate with the Global Construction Initiatives providing a technical support on the editing guide lines and procedure.
Project: Jubail Export Refinery – Package 2A - 40 ML Mhrs http://www.technip.com/en/press/technip-awarded-two-major-contracts-new-jubail-export-refinery-saudi-arabia http://www.satorp.com/project.html The whole Package 2A include the following plants: Distillate Hydrocracking, Mild Hydrocracking, Fluid Catalytic Cracking, Sulphuric Acid Alkylation, Unsaturated Gas Plant, Sulphuric Acid Regeneration Owner: SATORP (Saudi Aramco Total Refinering and Petrochemical) Mech.Subcontr.: SINOPEC, NESMA Location: Al Jubail – Saudi Arabia Functions: Management of all piping activities in the whole package such as Prefabrication, Erection and Testing. Coordination of the piping material flow from the receiving at warehouse to the final erection. Coordination of the Piping Superintends. Reference point for the Subcontractor’s piping activity trough project’s schedule and strategy.