Loïc CHEVREY PMP®

Project Manager/Sales Engineer chez Framatome

Chalon-sur-Saône, Bourgogne-Franche-Comté, France

About

Experience

  • Framatome (Permanent · 7 yrs 1 mo)
    • Project Manager/Sales Engineer - Nuclear heat production system
      Apr 2023 - Present · 3 yrs 3 mos

      Core mission : Global quotations management for Framatome Saint-Marcel Plant (BU PCM - France). Scope : Main Nuclear Island heavy components. The quotations are made in the frame of the Nuclear Steam Supply & Safeguard Systems (N4S) scope for large Nuclear Power Plant projects. Specifically in charge of the following activities related to the offer : - Internal KOM with plant contributors - Assistance in defining the structuring assumptions for costing of the work package - Price detailled reviews based on technical expertize - Building of the schedule related to the Engineering/Procurements/Manufacturing - Risks & Opportunities Register management - Global Price building & final consolidation - Acceptance reviews with the St Marcel plant & BU PCM Top Management - Issuance of final Price Breakdowns and Cash Curves - Lessons learned of the offer - Entry point for Framatome PCMHM Internal offer coordination Complementary missions : Technical & commercial bids for nuclear primary loop heavy components. - Technical clarification meetings with customers/contributors - Financial aspects, milestone payments definition - Contract management - Offer negociation - Customer relationship - Ensuring a good contract transfer to the Framatome operational divisions Products : Steam Generators, Reactor Pressure Vessel, Reactor Pressure Vessel Internals, Pressurizer, Main coolant Lines, Primary heavy Supports, …

    • Project Manager PMP®
      Sep 2022 - Mar 2023 · 7 mos

      HPC EPR Project - FTT UK Program / RPV Irradiation Surveillance Program / Primary Heavy Supports FTT: Fracture Toughness Tests The FFT UK program is part of the HIC (High Integrity Components) Justification It concerns : − Low alloy ferritic steel forgings of the primary circuit (Reactor Pressure Vessel, Steam Generator, Pressurizer) − Weld filler material for low alloy ferritic steel − Austenitic stainless steel for the main coolant lines and the crossover components. RPV ISP : Reactor Pressure Vessel Irradiation surveillance Program Material irradiation surveillance program for the UK EPR Vessel Core missions : - Management of the project/technical team - Monitoring of the costs/schedule/risks & Opportunities - Customer reporting and relationship - Reporting to the top management and the HPC project governance - Contract management with the customer and subcontractors

    • Project Manager PMP®
      Jul 2021 - Sep 2022 · 1 yr 3 mos

      HPC EPR Project - Reactor Pressure Vessel Internals & Primary Heavy Supports - Responsible of the scope management on the Reactor Pressure Vessel Internals and on the primary Heavy Supports of the Hinkley Point C EPR Project (2 Units) - In charge of leading a multidisciplinary team of 12 persons (including 2 persons as hierachical manager) to meet safety/quality/technical/schedule & cost requirements. - Steering of specific technical topics - Management of the customer/sub-contractors communication & relationship - Reporting to the project governance and to the St Marcel plant top management - Contract management (Early warnings, notices of claims…) - Management of the Risks & Opportunities register and the related mitigation plans Current certifcations : Framatome grade C / PMP® certified since 2019

  • Project Manager/Expert– key accounts at SAMSON REGULATION SAS
    Jan 2017 - Jun 2019 · 2 yrs 6 mos

    - International projects management / contract management : Project management for key account customers Industrial control valves, on-off valves packages and associated instrumentation Multi-production sites monitoring & coordination (France-Spain-Germany) Deliverables definition, team development, customer acceptance testings Expert support for strategic RFQs responses Main customer : Air Liquide Global E&C Some project references: • Air Liquide GEC SSTPC : Tianjin – China • Air Liquide GEC MISCO : Sohar – Oman • Air Liquide GEC SAND HILL : Túrkeve – Hungary

  • Project Manager/Project Engineer at SAMSON REGULATION SAS
    2010 - 2016 · 6 yrs

    - In charge of the RFQs from the EPC/engineering & key account companies : Industrial control valves, on-off valves packages and associated instrumentation Technical & commercial analysis / Bid clarification meetings RFQ answers / Commercial & contractual negociation Industrial valves & instrumentation sizings / Requirements analysis Technical expertise - Project management / Contract management : Global coordination / Schedule & budget monitoring Performance review meetings / Team management Stakeholder reportings / Customer relation management / Documentation management Internal & external procurement / Logistic management Some project references: • YAMGAZ YAMAL LNG : YAMAL peninsula - Russia • TECHNIP IKRA : Solvay Rusvinyl – Nijni Novgorod – Russia • TECHNIP SOBEGI : UTG Lacq – France • CNIM Lincolnshire : Lincoln – UK • AREVA COMURHEX 2 : Malvesi-Pierrelatte – France • VINCI Environnement CORNWALL ERC : St Denis – UK • TORAY CFE projet SE-1 : Lacq– France • HEURTEY PETROCHEM GAZPROM Coru project : Moscow – Russia

  • Technical consultant/Product manager at SAMSON REGULATION SAS
    2007 - 2009 · 2 yrs

    - Technical support to the company sales representatives & to customers - Customer technical trainings - Specific technical studies : calculations & tailor made design solutions - Technical procurement

  • R&D Mechanical Engineer at SAMSON REGULATION SAS
    2001 - 2006 · 5 yrs

    - Control valves & instrumentation engineering (Oil & Gas and Chemical Industries) - Strength calculations & design of mechanical parts - Legal regulation conformance & certification management - In charge of the global file management for 5 industrial products