Laura Oteiza

PMP®, Master in Project Management, MSc in Structural Engineering

Panama City, Panamá, Panama

About

I am a civil engineer with over 10 years of experience serving as a Project Manager for various types of civil and infrastructure projects, including metro systems and cable cars. I am passionate about delivering solutions that improve communities, and I am deeply committed to continuous learning and professional development. Over the course of my career, I have strengthened my abilities in teamwork, problem-solving, and analytical thinking—skills that have been critical in successfully coordinating diverse teams and stakeholders, including contractors, consultants, and representatives from both public and private sectors. I thrive in dynamic environments and quickly adapt to new challenges. With hands-on experience across all phases of complex infrastructure projects—from planning and design to execution and delivery—I bring a well-rounded perspective and a results-driven mindset. I am confident that my background and dedication will allow me to contribute effectively to the success of any organization I join.

Experience

  • Contract and Project Manager at Proyectos Mar Azul, S.A.
    Oct 2025 - Present · 10 mos

    • Serve as Contract Manager under FIDIC for the Norman Manley International Airport Runway Extension Project in Kingston, Jamaica, as part of the Engineering Supervision and Technical Inspection team. • Manage projects during pre-construction phase, including cost estimation, RFP preparation, contract drafting, and coordination of feasibility studies. • Act as primary point of contact to clients, overseeing contract administration, variation orders, addenda, insurance, and bonds, while safeguarding contractual compliance and client satisfaction.

  • Civil Engineer / Project Coordinator at Metro de Panamá
    May 2018 - Oct 2025 · 7 yrs 6 mos

    - Lead contract management for multiple megaprojects including Metro Line 2 Airport Extension, Line 3, Line 1 Extension, and San Miguelito Cable Car, as well as for consulting services providing MPSA with technical assistance for these projects. - Lead the team preparing the terms of reference and bidding documents for the selection of the contractor that will design, build, operate, and maintain the San Miguelito Cable Car - Coordinated negotiations regarding contract scope changes to incorporate the construction of a tunnel under the Panama Canal (Line 3) - Collaborate with contractors, financial institutions, and MEF to align and negotiate project financing for Line 3 - Served as MPSA lead, responsible for coordinating the execution and delivery of Line 2 Extension to Tocumen Airport project ($114M) - Created a tool to support MPSA’s long-term investment planning (2019–2040), enabling scenario evaluations based on projected annual budgets to support strategic decision-making - Developed financing simulations for upcoming projects to assess the impact of various payment schemes on MPSA’s annual budget - Introduced electronic signature workflows for the Project Department, significantly reducing time required to process and deliver official correspondence and optimizing State resources - Developed and implemented proposals to restructure project payments in coordination with MEF, allowing MPSA to meet financial obligations and launch new projects - Acted as technical reviewer and advisor to the Official Committee during the proposal evaluation phase for the Line 2 Airport Extension - Ensured adherence to project objectives and timelines by inspecting and monitoring construction progress across 16 Line 2 stations (Jul’18–Apr’19) - Participated in the preparation of official cost estimates for various mega-projects

  • Graduate Structural Engineer at Walter P Moore
    Feb 2015 - Apr 2018 · 3 yrs 3 mos

    Walter P Moore is an international consulting firm that provides structural, diagnostics, parking, and civil engineering services. As part of the Structural Engineering Services Group, my role included: • Analyzing architectural drawings to determine the structural system that best suited a project’s needs, while complying with local code requirements. • Guaranteeing the safety, integrity, and efficiency of the structure without compromising the building’s functional and aesthetic goals. This included coordinating and negotiating sizes and locations of structural elements with other design disciplines. • Standardizing design procedures within the Panama office, increasing efficiency and consistency when performing design tasks. • Executing third-party peer reviews of construction drawings and presented findings both on written reports and orally. • Developing solutions to construction problems and changes requested by contractors and subcontractors. • Presenting complex structural problems in a way owners and architects could understand to help them make informed decisions for projects’ success. • Calculating, designing, and detailing structural components for residential high rises, offices, and commercial buildings.

  • Structural Engineering Intern at Walter P Moore
    Jun 2014 - Aug 2014 · 3 mos

    •Designed post tensioned concrete slabs and beams using ADAPT PT •Serve as liaison between Panama clients and the U.S.-based delivery team and translate communication, construction documents, and marketing material from Spanish to English and vice versa •Prepared load plans and assembled calculation books for office and high-rise building projects

  • Structural Engineering Intern at Walter P Moore
    Jun 2013 - Aug 2013 · 3 mos