Laura Brem

Sr. E/I Design /Principal Designer

Bellingham, Washington, United States

About

Results-driven and hands-on Electrical Principal / Lead Designer with over 20 years of experience in Designing, Estimating, Developing, implementing efficient underground and above grade electrical systems in the oil and gas industry, and detailed wiring design in the development of single-line, and relay and metering diagrams, including medium-voltage and 480V systems. Especially skilled in verbal and written communication. Adept at leveraging skills in cross-functional collaboration to motivate and train a productive, quality-oriented team towards delivering high-quality, cost-effective results that meet project specifications and deadlines. Organized multitasker with a demonstrated track record of managing multiple priorities successfully in high-pressure, challenging, and deadline-driven working environments. Analytical problem solver with proven ability to adapt to client-focused needs while providing agility and forward-thinking solutions. Familiar with the NEC, NFPA, ASME, UL508A and Hazardous Area Classification.

Experience

  • Engineering Design Lead at New Earth Concepts LLC
    Mar 2026 - Present · 5 mos

  • Sr. Electrical/Instrumentation Design Lead at Eichleay, Inc.
    Aug 2018 - Jun 2025 · 6 yrs 11 mos

    Recruit, hire, assess skillsets, train, supervise and manage resources, discipline QA/QC, budget and schedule management, Electrical material take-offs, Engineering & Construction Estimating, SME for Electrical Design on-site, develop Site Technical Design Practices and Standards and Liaison for client contractors. Responsible for all construction package deliverables which include: Field Verifications | System Block Diagrams | Conceptual Layouts |Substation & Switchgear Layouts | Duct bank, Cable Tray, and Heat Trace Design | Single and Three-Line Diagrams | Motor Schematics & Wiring Diagrams | Key Plans | Plot Plans | Power Plans | Installation Details | Junction and Distribution Box Layout | Motor Control Centers | Conduit & Conductor Schedules | Cable Schedules | Grounding Systems | Area, building and Bay Lighting | Panel Schedules | UPS systems | Interconnection Diagrams | Point to Point checks|

  • BP Cherry Point Refinery (18 yrs 6 mos)
    • Sr. Instrumentation and Electrical Design Lead: Work Group Leader II
      May 2007 - Jun 2025 · 18 yrs 2 mos

      Recruit, hire, assess skillsets, train, supervise and manage resources, discipline QA/QC, budget and schedule management, material take-offs, Engineering & Construction Estimating, SME for Electrical Design on-site, develop Technical Design Practices and Standards and Liaison for client contractors. Responsible for all construction package deliverables.

    • Field Engineer
      2007 - 2009 · 2 yrs

      Electrical Construction Estimating and Material Take-offs, Conceptual Design, FEL activities related to construction

  • Sr. Electrical Design Lead at Anvil Corporation
    Aug 1994 - May 2007 · 12 yrs 10 mos

    Gasoline Hydrotreater Project: Chevron-Richmond, CA (2005-2007) Midcap project included new Substation and Electrical building, transformers, primary switches, feeders for 400 & 800hp VFD’s, filters, MCC’s, Switchgear, Control panels, panel boards, control stations, 4000’ of cable tray. Responsible for all engineering field work, project deliverables, liaison with field contractors, design estimating and material take-offs. Completed on-time and on-budget. Furnace Combustion System Upgrade, Intalco Aluminum Smelter Project included a complete as-build of the existing systems for (12) Furnaces, new control panels, alarming, lighting, grounding, junction box and the replacement of wire and conduit with High-temp wire. Master Electrical Plan, Tosco Ferndale Refinery, Ferndale, WA. (1992-1998) Project included Main Substation, Switchgear, transformers, primary switches, feeders, MCC’s, UPS system, oil switch replacement, transmission lines and poles. Interfaced with electrical field personnel and provided turn-around support. Additional Projects List available upon request.