Townsville, Queensland, Australia
March 2026 - Current (2027) <$10M Head Contractor - Murroona Gardens - Stage 4 New RAC & Laundry - New 24 Bed Residential Aged Care facility, two single level wings with external areas landscaped for comfort.
January 2025 - February 2026 <$25M Head Contractor - Mater Maternity, Renal and Emergency Department New 1200 sqm Maternity building on existing Campus and refit/extension of existing building into a new Renal Care centre, Maternity; - 12 Self contained bed short stay accomodation rooms, Break-out spaces and External open air gardens, - 3 Birthing Baths,, - 6 Neo Natal Care bays, - Full New Plant Room, including Automatic Transfer Switches, Distribution Boards and Mechanical Ventilation. Renal & Emergency Department - 10 Renal bays, - BoH utility rooms, - Plant Rooms for Mechanical Ventilation and Reverse Osmosis Systems. - 5 new ED Beds, HV Upgrade - New 750kv Transfomer, - Switch over from current site to new transformer for Mercy and Maternity, - Upgrades to Generator Pathing for Maternity and Renal
October 2023 - April 2024 Amaroo on Mandalay - Insurance Rectification Works <$1m 4 x 1 bedroom units, Fire damage and Re-roof unit block. - Specialist Asbestos removal, - Strip and Re-fit of two units - Electrical, Structural trades July 2024 - December 2024 Linear Industrial Park - Insurance Rectification works >$1m 2 x Industrial units with mezzanine offices, Fire Damage and Re-roof 400+sqm - Specialist remediation works - Interior strip out and refit - Electrical, Mechanical, Structural trades. October 2024 - January 2025 Rimex - Insurance Rectification works <$1m Fire Damage, Soot remediation and Re-roof 350+sqm - Specialist remediation works - Commercial Paint Booth - Electrical, Structural and Cladding trades.
Full Project Life Cycle - ITP Creation, Procurement and scheduling, SWMS and HSEQ management systems, Labour and Subcontractor Management. TFTA - Hydraulic Water Supply August to October 2023 -Pre-start Activities for the installation of a new Water Bore, Raw Water Storage tanks, 3.5km of Dn110 Poly under-bores under critical infrastructure, pumps and bores for the Australian Defence Force De-Seeder at the Fanning Sector. BEAP Items including Septic Tanks, Sewer Manholes, RO plant and Bore Manifold Replacement. Stanley St Stormwater Upgrade July 2023 - August 2023 - Removal and upgrade of current Stormwater infrastructure, reinstatement of Kerb and Road.
Charters Towers Road - New Watermain installation June 2022 - June 2023 Managing the bulk materials, pipe and fittings procurement for the projects as a whole, contract maintenance, claims preparation and additional works preparation for the Project manager, As-constructed drawings preparation and record keeping. - Lead the management of the Summerfield Park Underbore, a 110m DN400 PE underbore, pipe and fittings procurement, subcontractor selection and onboarding, testing and engineering management for the minor works. - Lead the management of the Sturges St watermain removal and installation. Pipe and fittings procurement, as well as stake holder and quality assurance management for the minor works.
Compliance and income tax preparation for SME's, tax planning and scenario preparation for year end tax planning. Individual tax returns for clients. Preparation of tax advice. Quarterly BAS preparation and client accounting file clean up and repair. Managing client relationships on behalf of the firm and providing smooth transitions between business life cycle stages.
Income tax compliance preparation for SME's and individuals.