Ahmet Kürşad Topcu

Senior Project & Technical Manager | Renewable Energy Assets (Wind & Hydro) • EPC Execution

Türkiye

About

Senior Renewable Energy Asset & Project Manager with 10+ years of experience leading utility-scale renewable energy operations, EPC execution, and asset management across wind and hydropower sectors in Türkiye and international projects. Currently focused on large-scale renewable asset performance, OEM governance, operational strategy, and next-generation energy infrastructure including BESS and offshore wind development. Throughout my career, I have managed multi-site renewable portfolios, complex EPC installations, and critical operational recovery programs under demanding technical and regulatory environments. Most recently, I led the operational and technical management of a 449 MW renewable energy portfolio consisting of: • 328 MW Wind Power (9 sites / 98 turbines) • 121 MW Hydropower (3 plants) Key areas of expertise include: • Renewable Asset Management & Operational Leadership • OEM Contract Governance (GE, Nordex, Enercon) • CAPEX/OPEX Planning & Budget Ownership • Major Failure Investigations & RCA Coordination • Multi-site O&M Strategy & Performance Optimization • Regulatory Coordination (TEİAŞ, EPDK, DSİ, Ministry of Energy) • Feasibility & Investment Readiness Studies • EPC Project Execution & Commissioning • SCADA Operations & Technical Performance Monitoring International experience includes EPC project execution in Nepal under challenging high-altitude and remote-site conditions. In addition to operational leadership, I have been involved in strategic renewable energy growth initiatives including offshore wind preparation studies, OEM negotiations, and BESS integration planning. Areas of Interest: • Renewable Energy Asset Management • Utility-Scale BESS • Offshore Wind • EPC Project Management • Renewable Operations Leadership • Energy Infrastructure Development Open to international and regional leadership opportunities within renewable energy, energy storage, EPC, and infrastructure sectors.

Experience

  • Maintenance and Projects Manager at Türkerler Holding
    Feb 2024 - Sep 2025 · 1 yr 8 mos

    Led technical and operational management of a 449 MW renewable energy portfolio (328 MW wind, 9 sites, 98 turbines; 121 MW hydro, 3 sites) across Türkiye, sustaining wind availability at ~90–95% through SCADA-based performance optimization. • Asset management & O&M oversight across 9 WPP and 3 HPP sites • Monitored and reviewed GE and Nordex OEM vibration analysis and borescope inspection reports; evaluated findings and coordinated corrective action follow-up • Planned and coordinated major component replacements including gearbox, main bearing, blade bearing and generator works • Led technical investigations for major turbine failures including blade crack damage; managed full OEM (GE) RCA process and directed insurance claim procedures • Managed OEM (GE) contract processes including delay notifications, formal warnings, escalation invoices and unpaid invoice follow-ups • Led multi-OEM turbine procurement evaluation (GE, Nordex, Enercon, Goldwind) and full RFQ process • Drove annual CAPEX/OPEX budget planning and major maintenance scheduling across 9 wind power plant sites • Regulatory coordination with TEİAŞ, EPDK, DSİ, Ministry of Energy and Forestry • Led a 21-person renewable energy operations team

  • Project Manager at Kochendörfer Hydro
    Aug 2023 - Feb 2024 · 7 mos

    Managed E&M installation of Pelton turbine and generator units for the 73.5 MW Middle Mewa HPP (Run-of-River with Regulation), representing Kochendörfer Hydro as main E&M equipment supplier. • Led 6-person cross-functional installation team; took over 80% of remaining scope from primary contractor • Oversaw FAT processes in underground powerhouse environment • Coordinated directly with project owner Mewa Developers ensuring schedule compliance and quality standards under high-altitude remote site conditions

  • Technical Manager at Koray Group
    Jul 2022 - Aug 2023 · 1 yr 2 mos

    Managed O&M of 3 HPPs (Bağbaşı 14 MW, Büyükbahçe 12 MW, Kaletepe 11 MW — 37 MW total) with a 20-person team; held full CAPEX/OPEX budget ownership and daily SCADA-based generation monitoring. • Led full recovery of Kayen Heta HPP following a catastrophic 1.8 km penstock failure and landslide; managed contractor selection, contract negotiations and complete reconstruction under DSİ regulatory pressure • Coordinated stakeholder management with DSİ, local authorities and affected communities • Managed planned/corrective maintenance, service agreements and HSE compliance across all 3 HPP sites

  • Projects & Site Manager (progressed from Mechanical Superintendent) at ENERGO-PRO
    Jun 2019 - Jul 2022 · 3 yrs 2 mos

    Project Manager / Mechanical Superintendent Litostroj Power & Energo-Pro | Jul 2019 – Jul 2022 | Kars / Artvin / Ankara, Türkiye Energo-Pro | Mechanical Superintendent Site Execution & Subcontractor Management: Acted as the primary mechanical site authority for the 96.99 MW Karakurt Dam & HEPP and the 2.5 MW Meydancık Eco HEPP projects, from greenfield construction through to the Commercial Operation Date (COD). Coordinated large field crews and mechanical subcontractors, effectively managing workforce planning, material/equipment requirements, and site production targets in strict alignment with the project schedule. Operational Monitoring & Reporting: Supervised the efficiency of field installations during HM/EM (Hydromechanical/Electromechanical) assembly processes, ensuring full compliance with technical specifications and quality standards. Prepared daily, weekly, and monthly progress reports for mechanical works and implemented rapid, effective solutions to operational issues arising on-site. Testing, Commissioning (T&C) & Official Acceptance: Coordinated the testing, inspection, and commissioning phases for both the Karakurt Dam & HEPP and the 2.5 MW Meydancık Eco HEPP projects. Managed the rectification of identified non-conformities, successfully leading the system start-up and the final official acceptance/handover procedures with the Ministry of Energy and DSI (State Hydraulic Works). Litostroj Power | Project Manager (Promoted) Managed simultaneous Pelton turbine manufacturing contracts for 2 HPPs in Bulgaria and Georgia; oversaw end-to-end production management of turbine components from kick-off to global delivery, coordinating with Slovenian engineering teams.

  • Project and Maintenance Engineer at Aydem Yenilenebilir Enerji
    Mar 2017 - Jul 2019 · 2 yrs 5 mos

    Aydem Yenilenebilir Enerji | Mar 2017 – Jul 2019 | Tokat → Denizli, Türkiye Site Engineer – Akıncı HPP (Mar 2017 – Jan 2019) | Tokat Managed HM fabrication workshop and directed 74-person multidisciplinary team (5 specialized teams) for the 99 MW Akıncı HPP; oversaw HM site erection, EM installation, auxiliary works, and testing & commissioning. Maintenance & Project Engineer – Portfolio (Jan 2019 – Jul 2019, Promoted) | Denizli Promoted to portfolio-level role; managed preventive and corrective E&M/HM maintenance across all Aydem Enerji HPP sites with a 6-person team.