Krzysztof Gorlewski

Lead Engineer w MEYER WERFT GmbH & Co. KG

Bremen, Bremen, Germany

About

Experience

  • MEYER WERFT GmbH & Co. KG ()
    • Lead Engineer
      Oct 2022 - Present · 3 yrs 10 mos

    • Design Engineer
      Apr 2021 - Oct 2022 · 1 yr 7 mos

  • Deck equipment senior designer at Freelance
    Jan 2021 - Apr 2021 · 4 mos

  • Deck equipment senior designer at HRsolution service GmbH
    May 2020 - Dec 2020 · 8 mos

  • Design Engineer at MEYER WERFT GmbH & Co. KG
    Mar 2020 - May 2020 · 3 mos

  • Remontowa Marine Design & Consulting (9 yrs 3 mos)
    • Head of Deck Equipment & Interior Department
      Nov 2016 - Mar 2020 · 3 yrs 5 mos

    • Senior Design Engineer – Deck Equipment
      Jan 2011 - Oct 2016 · 5 yrs 10 mos

      Preparing contractual, basic and detail design documentation. Preparing documents and conducting tenders for deck equipment in the field of technical regulations based on the Technical Specifications and the required Classification Rules (SOLAS, LR, DNV-GL, ABS, PRS, etc.). Responsible for completion of all deck equipment documentation in terms of: deck equipment (Rudders and Steering Gears, Tunnel Thrusters, Anchor and Mooring Equipment , Life Saving Equipment, Cranes, etc.), deck outfitting (Evacuation Ways, Railings, Stairs, Masts, etc.), Hydraulic Systems. Contact with Owner representatives, Classification Society inspectors and equipment suppliers Execution of test procedures for the dock and sea trial programs in the field of deck equipment. Supervision of the deck equipment installation on newly built and converted vessels.

    • Design Manager
      Apr 2013 - Apr 2015 · 2 yrs 1 mo

      Leader of the design team carrying out Detail Design documentation for drilling equipment installation and drilling systems (Drillship project): - Low Pressure Mud systems and equipment, - High Pressure Mud systems and equipment, - Drilling Equipment hydraulic installations, - Arrangements of drilling compartments: Mud Pump Room, Mud Tank Tops, Dry Bul, Compartments, Riser Bay, Mud Mixing Room, Cementer Room, etc.