Kris Van de Velde

Chief Surveyor bij DEME Group

Wichelen, Flemish Region, Belgium

About

Experience

  • DEME Group (8 yrs 8 mos)
    • Chief Surveyor
      Sep 2018 - Present · 7 yrs 11 mos

      Construction of new Lock.

    • Chief Surveyor
      Aug 2018 - Sep 2018 · 2 mos

      Maintenance dredging works port of Banjul.

    • Chief Surveyor
      Jun 2018 - Aug 2018 · 3 mos

      Construction of new lock.

  • DEME Group (8 yrs 8 mos)
    • Chief Surveyor
      Jul 2017 - Oct 2017 · 4 mos

      Maintenance dredging campaign at Port of Conakry.

    • Chief Surveyor
      Mar 2017 - Jul 2017 · 5 mos

      Dredging & reclamation for the construction of new container terminal + industrial areas.

    • Chief Surveyor
      Jan 2017 - Feb 2017 · 2 mos

      Capital dredging by TSHD, widening entry channel + dredging access channel and Port basin.

  • DREDGING INTERNATIONAL (8 yrs)
    • Chief Surveyor
      Jan 2007 - Mar 2009 · 2 yrs 3 mos

      NLNG SevenPlus Project: supply of sand (hydraulic fill) on 6 different locations for the extension of NLNG plant, dredging and reclamation with a trailing hopper suction dredger, site preparation, fencing and drainage works. Bonny River Long Term Contract.

    • Chief Surveyor
      Apr 2006 - Jan 2007 · 10 mos

      Dredging and reclamation of sand in Okuru-Ama near Port Harcourt. Technical support to several projects in the Niger Delta.

    • Senior Surveyor
      Mar 2006 - Apr 2006 · 2 mos

      Sanitation of 2 lakes: dredging, transport, dewatering and disposal ashore (in geotubes) of contaminated sediments, water purification of tailing water during the dredging operations.

  • Landmeter at Studiebureau Talboom
    May 1999 - Mar 2001 · 1 yr 11 mos

  • Arbeider / Landmeter at Adegro NV
    Sep 1998 - May 1999 · 9 mos