Boxmeer, North Brabant, Netherlands
Sofia windfarm: I was a superintendent responsible for load-in, load out and preparation works of secondary steel componants in the marshalling Port of Tyne for the Sofia windfarm. They are part of the foundation of a windmill. After the largest amount of work was finished in Tyne, I joined the punch campaign on the REM Power and the Dos Notus as a superintendent. The scope of the job was to close off all the standing issues after installation of the foundation (for instance the replacement of stainless steel brackets, installing the Sikaflex seal and repair works on the flange after installation). St. Brieuc windfarm On the Onyx as a superintendent for grout transfer. I was the representation for Van Oord on this vessel. On the Ievoli Amber I was the superintendent of the nightshift. We were the vessel responsible for completion works on the vessel, assisting the Seajack Scylla with installation of the jackets, pinpile cleaning, removing of boulders on the seabed and serveral surveys.