Kin Sum S.

Electrical Design Engineer / Project Manager @ UK

United Kingdom

About

 13+ years of progressive experience in electrical, ELV & vertical transportation system design and coordination with various professions in building services industry  4 years of experience in project management  Practical experience in diversified project types  Knowledgeable in a variety of mechanical systems  Understand key of success to liaise with professions and strive for achievement of project goals and objectives  Experience in Hong Kong (BS standard), Taiwan (CNS standard) and China (GB standard)  Able to adapt to working in multiple cultural environments

Experience

  • Senior Electrical Engineer at Cooper Homewood Limited
    Nov 2023 - Present · 2 yrs 8 mos

    ·Providing electrical building engineering services design to buildings ·Compiling specifications, drawings and relevant Contract documents and maintain the required technical quality of work, ensuring that designs comply with the relevant Codes, Standards, Regulations and Procedures ·Working with other Principal Engineers to ensure quality and timely operation delivery for clients

  • Project Manager at WSP
    Jul 2022 - Apr 2023 · 10 mos

     Led a team of MEP engineers, structural engineers, civil engineers for addition & alteration projects and a new-build data center project  Managed the client relationship to ensure the client was well informed about the project progress  Established the design objectives, criteria and parameters  Presented design concept to operators and engaged with them for incorporation of requirements during the design stage  Developed and implemented project plans and schedules  Worked collaboratively with team members to meet project objectives in a timely and cost-effective manner  Monitored financial expenses on projects considering project targets  Drove internal staff to overcome challenges  Managed and oversaw a team and ensure that all team members were working together effectively  Performed MEP contract administration in projects  Practical experience for data center design and management

  • Project Manager at West Kowloon Cultural District Authority
    Jul 2019 - Mar 2022 · 2 yrs 9 mos

     Managed and monitor the progress of building services systems installation during the construction stage  Provided advice on method statements / construction methods  Liaised with all internal and external stakeholders in accomplishing project objectives including Value Engineering exercise (VE) and Design for Manufacture and Assembly (Dfma)  Worked with operational team to deliver project solutions that supported the operational model  Drove consultants and contractors to deliver the agreed scope of works on time  Identified risks for potential delays on critical path of programme/schedule and drove design and installation teams to resolve it collaboratively in timely and costly manner

  • Associate at P&T(M&E)Ltd.
    May 2016 - Jul 2019 · 3 yrs 3 mos

     Led a team of 6 electrical engineers for electrical systems design & coordination with mechanical system designers  Planned projects including resources allocations and forecasted costs to all deliverables in different stages on time  Managed the client relationship to ensure the clients were well informed about the project progress  Ensured invoicing schedules are in place for project and agreed with clients in a timely manner  Monitored financial spend on projects against project target  Engaged with users/operator for incorporation of requirements into MEP systems during design stage  Managed the identification of non-compliance and design deficiencies, providing advice to reach timely resolution  Attended meetings with clients, utilities companies and contractors for troubleshooting  Handled project administration and supervision till the completion of the contracts  Settled final account for the works, assessment on extension of time from the contractors  Attended factory acceptance tests  Practical experience on alteration / modification works

  • Building Services Engineer at Ove Arup & Partners Limited
    Jul 2012 - Mar 2016 · 3 yrs 9 mos

     Established the design standards, criteria and parameters for the electrical system  Analysed various power supply schemes to achieve cost and spatial requirements  Liaised with the architects, consultants, contractors and local authorities  Executed for loading estimation of electrical system, electrical power system design with Schneider and ABB switchgear, lift traffic analysis simulation & ELV system design  Provision of technical specification and necessary documents for tender purposes  Provision of detail design drawings and calculations for tender purposes  Provision of technical & financial tender evaluation reports for the selection of appropriate contractors  Reviewed & accessed contractor submission for drawings and materials to ensure no deviation from the project specification and standard  Responded to the request for information from contractors to resolve MEP installation matter to move forward  Attended site acceptance tests to comply with project specification and standard  Particularly work for commercial and super high-rise buildings