Khalil T.

PMP certified - Offshore Project Engineer - Oil and gas industry

France

About

Driven and detail-oriented Project Engineer with extensive experience in offshore operations and construction management. I possess a strong capacity for problem-solving and decision-making in high-pressure environments, ensuring that projects meet their deadlines while adhering to regulatory standards. My ability to lead cross-functional teams and foster effective collaboration is complemented by a focus on safety and process optimization. Below project that I have successfully delivered : • EPR Unit 1 & 2 Taishan nuclear plant in China • Sulphur conveyor and shiploader of Refinery Al Zour in Kuwait • Participate in ITER project at South of France • BALEINE offshore oil & gas project in Ivory Coast • LAPA SW offshore oil & gas project in Brazil

Experience

  • Offshore Project Engineer at Saipem
    Apr 2022 - Present · 4 yrs 3 mos

  • Project Engineer - ITER - International Thermonuclear Experimental Reactor at Dalkia
    Jun 2020 - Jun 2023 · 3 yrs 1 mo

    Projects in this context: ITER : International Thermonuclear Experimental Reactor In southern France, 35 nations are collaborating to build the world's largest tokamak, a magnetic fusion device that has been designed to prove the feasibility of fusion as a large-scale and carbon-free source of energy based on the same principle that powers our Sun and stars. Assignments : Project Engineer TB11 – Retrofit and finishing works in the Tokamak complexe - Liaising with the client and ensuring that the work is delivered within the agreed timescale and budgets, - Leading the technical weekly meeting with the client and the designers - Writing reports including technical feasibility studies and building inspection reports, - Extracting key information from drawings, schedules and specification - Familiar with actual resourcing levels versus budget and reporting of reasons for difference, - Marking up the progress achieved weekly contributing to collection of data for key performance indicators and substantiating the reasons for discrepancies, - Monitoring of as-built quantities - Ensuring that the works are performed in accordance with the project requirements, - Raising any non-conformance reports when it is necessary - Producing accurate records containing daily diary, photographs and site discussions, - Carrying-out site inspections and respond to technical issues raised by the Site Team, - Completion of Quality Check Sheets and production of information for Handover documentation in a timely manner in line with the project’s program

  • Methods & Construction Engineer (Kuwait) at Saipem
    Nov 2018 - Jun 2020 · 1 yr 8 mos

    Projects in this context: EPC Contract for Al-Zour new refinery construction. A 1,700 meter jetty for loading ships with sulphur granules produced in the refinery. The jetty will be extended by a wharf and is to carry a 3.6 km conveyor belt linking the refinery with the ship loader (500T). Assignments : Assembly and pre-commisioning of conveyor (3,6km) and shiploader (500T): Definition of the intervention plan, Definition of the human and material resources (160 workers), Definition of the method of construction and lifting plans, Coordination of the various aspects involved in the project infrastructure/superstructure/electricity/instrumentation/piping, Customer’s first contact regarding conveyor and shiploader, Installation of rotating/stating equipment: Monitoring supplier and subcontractors of the equipment (Air compressor, Air dryer, Pressure vessels, Tank). Definition of the delivery and installation method, Setting up and monitoring of the preservation of the equipments,

  • Eiffage Métal (7 yrs)
    • Methods & Construction Engineer (China)
      Nov 2014 - Oct 2018 · 4 yrs

      EPR Nuclear Plant Construction Site, Taishan, (China) – On site Assignments : • Supervisor of assembly and commissioning of the HATCH (Equipment Access in Reactor Building) unit 1 & 2. This access allow sealing of the reactor building. Managing a team between 4 and 8 Chinese workers. • Supervisor of maintenance and additional work on the Polar Crane in reactor building. Managing a team between 4 and 8 Chinese workers. • In charge of the quality documents of the project. Following and filing the FUD (Follow Up Document) and updating the EOMR (End Of Manufacture Report) of the HATCH (Unit 1&2) and polar crane (Unit 1&2). • Planning and subcontractors management. • Management of commercial relationship and negociation of additional work on site. Projects in this context: French nuclear plant - Metallic structure to protect the future cooling system from earthquake and whirlwind. Assignments : Writing intervention documents Following list of plans and documents of the project Sending the documents ready to the customer Projects in this context: French nuclear plant, PALUEL (76) - Replacement of Steam Generators – On site Assignments : Writing intervention documents to disassembly and assembly the steel structure around the steam generators Site survey to write intervention document for additional work Assistance of the intervention team on site

    • Mechanical Design Engineer
      Nov 2011 - Nov 2014 · 3 yrs 1 mo

      Projects in this context: French nuclear plant - Metallic structure to protect the future cooling system from earthquake and whirlwind. Assignments : Verification of the design calculation Design and calculation of the ties between the beams and the concrete. Projects in this context: Free fall simulator, City of sciences and industry, Paris La Villette (75) Assignments : Creation of the model on ROBOT Analysis Structural from a first conception Redesign of the floor after verification Design and calculation of the ties between the beams and the concrete Redaction of the final calculation note transmitted to the customer. Projects in this context: BRIDGE, LA VANELLE, France, Isère (38) Douces system Fr: Système d’affalage (translate) Assignments : Setting up the testing sheet to validate the douces system Mounting system with a worker in the workshop at Havre (76) Execution of the campaign test with the client Feedback in writing about the conduct of the campaign test