Khalid Saeed

Chief executive at COGEN CONSULT

Pakistan

About

Experienced Executive with a demonstrated history of working in the utilities industry. Skilled in Negotiation, Gas Engines, Diesel Engines, HFO Power Plants, Steam Turbines (Coal, HFO, Gas) , Gas Turbines (Gas ,Diesel, HFO, Crude Oil) Project design Engineering & Management. Strong business development professional with a Bachelor’s Degree focused in Mechanical Engg from NED Engg. Univ 1981 ,Karachi Pakistan. Specialized in Energy Conservation, Waste Heat Recovery, Energy Audit, Alternate Energy, Solar, Small Hydro (canals) , Combined Generation, Bio-Gas (Animal waste), Sea Tidal Waves, Biomass Gasifiers, Coal gasifier, Absorption Chiller, Ammonia Absorption Chillers,

Experience

  • ENGR. KHALID SAEED - PRINCIPAL ENGINEER (CEO) at cogen consultants
    Feb 2005 - Present · 21 yrs 5 mos

    CHIEF EXECUTIVE -RPNCIPAL DESIGN ENGINEER FOR GAS DIESEL HFO POWER PLANT DESIGN ENGG- PLANNING-DESIGNING & IMPLEMENTATION (PD&I) , SPECIALIST IN WASTE TO ENERGY (WET) ENERGY EFFICIECNY FOR ECONOMY, ENERGY CONSERVATION, COMBINED GENERATION SYSTEMS, CHP(COMBINED HEAT & POWER SYSTEMS) , MEMBER PAKISTAN EPA (ENVIRONMENTAL PROTECTION ASSOCIATION) , DESIGN AND INSTALLED 3000 GAS GENSETS, 850 COGEN SYSTEMS ,400 HOT WATER CHILLERS ALL OVER PAKISTAN.

  • COGEN CONSULT (21 yrs 5 mos)
    • Chief Executive Officer
      Feb 2005 - Present · 21 yrs 5 mos

      ABOUT COGEN CONSULTANT DESIGN ENGINEER ENGR. KHALID SAEED - PRINCIPAL ENGINEER (CEO) 30 YEARS IN POWER & ENERGY CONSERVATION -ENERCON. (2005-2011)- 6 Yrs. COGEN CONSULT- CHIEF EXECUTIVE ENGR. KHALID SAEED, ENERGY & POWER PLANT DESIGN CONSULTANT PROJECT MANAGERS , (1995-2005)- 10 Yrs. COUNTRY MANAGER - CATERPILLAR PAK- (ALLIED ENGG) - COUNTRY MANAGER TECH- HEAD OF TECH CELL FOR POWER PLANT DESIGN EXECUTIVE ,INSTALLED 1500 GAS & DIESEL GENSETS BASED POWER PLANT ALL OVER PAKISTAN. (1992-1995)-3 Yrs. CHIEF ENGINEER - FTC COGEN – DY CHIED ENGINEER - FTC COGEN POWER PLANT - KARACHI PAKISTAN (1990-1995) FOR STEAM TURBINES -POWER PLANT - DY CHIEF ENGR. FTC SH-E-FAISAL BLDG COGEN POWER PLANT 2X3 MWE STM TURBINES+4X750 RT STM ABSORPTION CHILLER FOR COMMERCIAL BUILDING. (1990-1995)-5 Yrs. OPERATION ENGINEER -GAS TURBINES – 125 MWE -SCECO© - RIYADH GAS TURBINE POWER PLANT OPERATION ENGINER, WADI UD DAWASIR SCECO CENTRAIL(RIUADH) KSA, FOR 7X25 MWE GAS TURBINES AEG KANIS POWER PLANT IN LAYLA AFLAJ AND WADI ADAWASIR, - EXECUTIVE ENGINEER - KESC BIN QASIM POWER PLANT UNIT # 1 & 2 (1982-1987)- 5Yrs. OPERATION ENGINEER –STEAM TURBINES - KESC-BIN QASIM POWER PLANT -OPERATION ENGINEER KESC BIN QASIM POWER PLANT UNIT 1 N 2, 2X210 MWE STEAM TURBINES POWER PLANT HFO FIRED,HITACHI BABCOCK, PROJECT ENGINEER- AT AMMONIA UREA COMPLEX FFC - AQUATOR SNAMPROGETTI - (1980-1982)-2 Yrs. PROJECT ENGINEER-GAS TURBINES COGEN 19 MWE–FFC-AQAUTOR-R.Y.KHAN. ASSISTANT ERECTION/INSTALL ENGR, AT FFC R.Y.KHAN WITH AQUATOR SPA,SNAMPROGETTI ITALIAN GROUP AT AMMONIA UREA COMPLEX FOR 2X19 MWE GE USA GAS TURBINES WITH EXHAUST SMOKE WASTE HEAT RECOVERU BOILERS FROM FOSTER WHEELER CORP.,USA, WITH DUCT FIRING AUX BURNERS. =========xx====================

    • PRINCIPAL ENGR (CEO)
      Feb 2005 - Present · 21 yrs 5 mos

    • CHIEF EXECUTIVE (CEO)
      Feb 2005 - Present · 21 yrs 5 mos

      Power plant designing, contacts visits to customers, discussing power plants design economy fuel saving, type or power gen, gas diesel fuel saving, co-generation systems explaining and convincing to install waste to energy project with new power plant to achieve 80% Thermal Efficiency and save 45% gas/Diesel/Fuel Bill

  • Country Manager Technical at Caterpillar Pakistan - Power Systems (Country manager Technical, Allied Engg & Services)
    Feb 1995 - Feb 2005 · 10 yrs 1 mo