Khaled Wehbe

NEOM Project

Sharma, Tabuk, Saudi Arabia

About

Very good experience in project management, civil construction and supervision, dewatering, and finishing works, in addition to U/G utilities, hardscape, road & pavement works

Experience

  • Construction Manager at Bechtel Corporation
    Nov 2023 - Present · 2 yrs 8 mos

  • Almabani General Contractors (Full-time · 9 yrs 6 mos)
    • Construction Manager
      Jul 2020 - Nov 2023 · 3 yrs 5 mos

      KFAA Phase 6: Residential area Construction of the residential area of the KFAA, consisting of: 1. Package 12A-Family Housing: Sub‐Officers buildings 10no., Officers buildings 10no., High School-Boys, Primary School-Boys, Primary School-Girls, High School-Girls, Kindergarten School, Fire Fighting Station No.01, Internal Gate House Type 1 & all related utilities, Club Officer, Primary Clinic, Mosque, Communication Node Building, Sewage Lifting Station No.01 & all its related services & buildings, Irrigation Tank/Pumping Station No. 6 with all its related services & buildings. 2. Package 12C-Bachelor Housing, Officers Housing 2no., Sub-Officers Housing 2no, Mosque, Sewage Lifting Station No. 01, Irrigation Tank and Pumping Station No. 7 with all its related service buildings. Managing teams for: Site mobilization: Plan & execution: Erection of 5 tower cranes (out of 11), satellite site offices with all related services and required civil & MEP Fabshops External works: Clearing & Grubbing general site backfill and Excavations for above mentioned structures, from the new RGL. Substructure works, concrete blinding/foundations/damp proofing/backfill up to slab on grade Daily meetings to follow up through trackers to ensure daily targets are met to reduce the progress deficit caused by the delay of the design and client last minute changes Coordination between Engineering, cost, planning & quality mainly to ensure the best outcome of the works Chairing numerous types of meetings with all crafts to ensure proper coordination, between client, subcontractor, quality, safety, etc.… Negotiating and certifying monthly payments with the client and subcontractors. Preparing bases for claims and official letters between NAS JV and both client and subcontractors’ teams

    • Construction Manager and Deputy Project Manager.
      Jun 2014 - Jul 2020 · 6 yrs 2 mos

      Riyadh Metro Project Main Contract Value: $10,000,000,000 Responsibilities: Line1-Olaya Batha Corridor: (September 2019 till Now): Refurbishment of the entire Line 1 Olaya & King Faysal roads from North to South Depots Managing teams for: External works: Demolition of the existing road asphalt and removal of the old CABC. Excavations and execution of the underground utilities. Erection of precast manholes to serve the numerous networks. Line1-North Depot: (February 2016 till August 2019) • 2 steel structure buildings with concrete foundation: Erection, alignment, cladding • 4 concrete buildings: concrete, blockworks, plaster and paint • Underground utilities networks: Storm, Sewer, Low voltage, medium voltage and traction Power • Road and track works Managing teams for: External works: Excavations and execution of the underground utilities. Construction of 125no. chambers and erection of 100no. precast manholes to serve the numerous networks. Internally Works inside building: CMU walls & plaster, all types of wall & floor coatings, Gypsum dry walls & false ceiling. Raised floors and Marble, tiles & skirting works. Utility diversions: (June 2014 till February 2016) • Potable water 800mm, 300mm and 150mm Dia. pipes • Storm 1200mm dia 6m deep and Sewer 500mm dia 4m deep pipes • Electrical cables 132kV, 33kV and 13.8kV. and Telecommunication from Mobily & STC:

  • C.A.T. Group (Full-time · 11 yrs 1 mo)
    • Estimation Engineer
      Jul 2012 - Feb 2014 · 1 yr 8 mos

      Project: Estimation Department. Responsibilities: Quantities take-off, Preparation of Request for quotations packages. Comparing and implementing quotations. Worked on the Estimation of Several Projects in: Qatar: Msheireb phase 3, JK1 cultural forum, QSTP testing facility, Qatar Ashghal west bay, Orbital Highway QCP Wadi modular DCP, Qatar West Bay District Cooling Plant 3, Qatar Kahramaa PLs Mega Reservoirs Corridor Main 2 KSA: Trap Compression Facilities at Safaniya, SA 489894-Haradh Satellite Fields Construction (2013), KSA Marafiq YNB-PR5280 Lift Station, Closed Drain System at Yanbu Refinery, 501716 Shedgum-Yanbu PL Loop 4&5 UAE: WAG Wells at Sahil, UAE Yas Mina Zayed Gas plant, UAE ADCO NEB Phase 3 SKEC, UAE ADCO 15665.01-EC10889 Thamama Zone B E&I

    • Project & Interface Coordinator
      Dec 2009 - Jun 2012 · 2 yrs 7 mos

      New Doha International Airport (NDIA), CP60: Central Utility Plants Project. Main contract Value US$ 252,900,000. Civil portion Value US$ 60,000,000 consists of 3 Central Utility Plants CUP2, CUP3 and CUP4, with a built-up area around 21,000 m2. These plants will be supplying permanent chilled water and backup power to facilities inside the Airport. Responsibilities: Coordinating the works between the 3 CUPs, interfacing with other CPs (contract packages) contractors regarding temporary/permanent requirements, connections and supplies from the plants to facilities including and not limited to civil, electrical and mechanical works inside other’s plots. Establishing a utilities database for the entire Airport showing all underground and above ground utilities for design purposes and for the execution of works. Coordinating between Overseas Bechtel Incorporated and our site teams for the Electro-mechanical and civil works; organizing schedules and look-ahead, attending the weekly and bi-weekly construction and coordination meetings with OBI and all the contractors for all interface issues. Coordinating reports between the 3 plants: Collecting each CUP reports (works, manpower, progress, planning, etc.…). Coordinating concrete between the 3 plants: Coordinating concrete supply from main batching plant to each CUP organizing pouring schedule and 3 weeks look-ahead, issuing the payments.

    • Senior Project Coordinator
      Apr 2009 - Nov 2009 · 8 mos

      Porto Arabia Townhouses and retails nodes at the Pearl project - Qatar Main contract Value US$ 332,670,000. Civil portion Value US$ 193,685,000 consists of 12 Parcels containing Townhouses (furnished apartments) and/or retail nodes, with a built-up area above 252,0000m2. Position: Sr. Project Coordinator Responsibilities: Coordinating and supervising the works between all 12 parcels, coordination of material and activities. Controlling between several subcontractors on all 12 Parcels, Planning the works, daily and weekly look heads. Daily and weekly progress reports, control and managing of manpower, Quantity surveying.

  • Civil Engineering Professional at ARCA - Eng. Ziad Macary
    Oct 2000 - Jan 2003 · 2 yrs 4 mos

    Project: Villa Kabchi, North Lebanon Contract Value US$ 1,200,000. The project consists of 1400m2 total living area, 6m deep excavation, waterproofing, retaining walls, Arches, Stone Cladding walls, and Insulation. Landscaping on 9,000m2 garden+ plants irrigation sprinkler system+ construction of 3 underground water storage facilities, and Drilling water well. Constructing of pergola and 50m2 detached genitor’s house. Installing anti-theft alarm system, live connection with local police station via phone line, automated fire alarm, and generator.

  • Civil Engineer at Solo S.A.R.L.
    May 2000 - Sep 2000 · 5 mos

    Deir Aamar – Aabdeh road rehabilitation via Ministry of public works Projects Contract Value US$ 7,000,000. The project consists of 10 Km road, removing old pavement & Excavation 1 meter below, backfilling with new gatch + compaction up to the standards. Laying new asphalt pavements after installing the missing/damaged drainage pipes + New Jersey + public lighting poles. Responsibilities: Executing and supervising the works, coordination between the activities. Coordinating with designers and suppliers, planning the works, daily and weekly look heads. Daily and weekly progress reports, control and managing of manpower, Quantity surveying.