Hong Kong SAR
Took lead of project management, including program, contractual issue, work progress, quality and safety Prepared works method statement and submissions for construction of Pier
NL/2020/02 Salt Water Pumping Station, Salt Water Service Reservoir, laying of salt watermains & fresh watermains, compensatory woodland planting Take lead in project management include progress monitoring, contractual issues; Oversee the overall work progress, quality & safety; Prepare works method statement submission.
Work as an assistant site engineer handling site works of ELS ,District cooling system pipe installation, underground Chamber, Mini TBM works, etc. (including method statements, communicate with design team, etc.)
Steel frame & RC design and checking, A&A Works Demolition works Foundation and Superstructure design Structural Drawing
Steel frame & RC design and checking, A&A Works Demolition works Foundation and Superstructure design Structural Drawing