Kai-Julian H.

Geotechnical Engineer

Munich, Bavaria, Germany

About

Working on multiple marine construction projects provided significant practical experience which inspired me to proceed with my studies and do a M.Sc. with a focus on geotechnical engineering. For my master thesis I investigated the life cycle carbon footprint of alternative quay wall designs for a port construction project. (download the thesis by copy and pasting the following URL into your browser: https://fenix.tecnico.ulisboa.pt/cursos/mec/dissertacao/1128253548922147) I build on my practical experience to solve various geotechnical and civil engineering problems inorder to provide optimal and efficient solutions.

Experience

  • Project Engineer at Boley Geotechnik
    Nov 2020 - Present · 5 yrs 11 mos

  • Masters Student at INROS LACKNER SE
    Feb 2020 - Jul 2020 · 6 mos

    Executing Master Thesis in conjunction with Inros-Lackner SE Bremen: My Master Thesis consisted of developing alternative outline designs for a quay wall construction project and then doing a Carbon Footprint, Life Cycle Assessment using SimaPro to determine the carbon footprint of the various designs. Concurrently one day per week as a student assistant, responsibilities included: - Assisting with the interpretation of geotechnical ground investigation - Assisting with the assessment of a time claim

  • Site Engineer at Waterway Constructions Pty Ltd
    Mar 2018 - Aug 2018 · 6 mos

    Site Engineer at the Eden Breakwater Wharf Extension Project, Eden, NSW, Australia

  • Site Civil Engineer at Stefanutt Stocks Coastal
    Jun 2017 - Aug 2017 · 3 mos

    Site Engineer for Stefanutti Stocks Coastal on the project for the Bel Air Mining Guinea Bauxite Export Port Facility Project as Site Engineer. Located at Cap Verga in the Republic of Guinea, West Africa. Sie Engineer roles included project planning, developing method statements, quality control and safety management, monitoring production and surveying using a GPS rover.

  • Stefanutti Stocks Coastal (2 yrs 1 mo)
    • Site Engineer
      Jul 2015 - Jan 2017 · 1 yr 7 mos

      Site Engineer at the Reconstruction and Deepening of Maydon Wharf Berth 1-4, 13 and 14 ; Durban, South Africa

    • Methods and Planning Engineer
      Jan 2015 - Jun 2015 · 6 mos

      Methods and Planning Engineer in the Tender Department for Stefanutti Stocks Coastal.