Germany
An engineering professional with extensive experience in piping construction and mechanical project execution within large-scale EPC projects in the oil & gas, petrochemical, and industrial sectors. Throughout my career, I have worked in international project environments alongside major EPC contractors and subcontractors, contributing to complex projects from construction through commissioning and start-up. My professional background includes roles as Piping Engineer, Supervisor, Manager, and most recently Piping Superintendent. I hold an academic background in engineering and have developed practical expertise in piping construction and erection (both underground and aboveground systems), fabrication coordination, mechanical system completion, punch list management for project handover, and commissioning support. I have been actively involved in field execution, construction planning, and coordination of multidisciplinary teams. My responsibilities have included supervising site activities, organizing manpower and resources, coordinating with engineering and quality teams, resolving technical issues in the field, and ensuring that work is executed in line with safety, quality, and project schedule requirements. I also have experience supporting system completion and preparing systems for commissioning and start-up, working closely with engineering, HSE, quality, and commissioning teams to ensure smooth project handover. Having worked on large international projects, I developed a structured and solution-oriented approach to construction management and site coordination. I am passionate about my profession, motivated to continue developing my technical and leadership capabilities, and committed to contributing effectively to complex industrial projects.
Managing and Planning Piping Erection and Test Package Completion Activities Organizing Completion of Subsystem with Related Disciplines Organizing and Tracking Punch Closure Activities for Mechanical Completion Supporting Commissioning Activities Organizing Guarantee Management of the Project
Managing Metallic Piping Fabrication Activities at Piping Workshop Preparation of Fabrication Activities According to Issued Material and Priorities Tracking of Fabricated Spools for Completion of NDT/Painting for Erection at Site Support Fabrication and Tracking According Project Schedule Managing Underground Metallic Piping Activities and Completion of Underground Systems Managing Piping and Support Erection Activities and Completion of Test Packages Orginizing Punch Clearence Activities for Subsystem Completion Supporting Mechanical Completion Activities with Electro Mechanical Disciplines
Construction Punch Clearence – Punch Closing and Completion of Subsystems after Mechanical Completion Walkthrough AG Piping Construction – Construction, Testing and Reinstatement Activites of Carbon Steel, Stainless Steel, Alloy Steel and Cladded Pipes Mechanical Construction – Erection & Alignment of Mechanical Equipment and Interconnection Activities Between Civil-Mechanical-Piping and Instrument Disciplines UG Piping Construction – Installation, Testing, Backfilling and Reinstatement of UG RTR Pipe (Sewer Systems / Fire Water and Utility Water Systems) & UG Valve and Manhole
Planning and Following Piping and Support Erection Activities Planning and Following of the Reinstatement Activities Following Punch Closure Activities for Subsytem and Mechanical Completion Performing Field Modification and Tie-In Activities Performing Pre-Commissioning Activities, Catalyst Loading and System Preparation Before Start-Up Performing Spooling Activities with Smartplant SpoolGen Monitoring and Reporting of Piping Fabrication Activities Monitoring Revision Implementation and Modification of Piping Fabrication Perfoming Spool Release Activities for Dispatch to Pianting Shop and Site Monitoting Piping Workshop and Site Material Coordination Activities Coordination of Piping Shop Material Handover with Contractor and Client