Germany
Laying of 32km transmission main DN200-DN400, construction of 2 booster pump stations and 2 reservoirs in Lomahasha / Eswatini and Namaacha / Mozambique
Laying of 32km transmission main DN200-DN400, construction of 2 booster pump stations and 2 reservoirs in Lomahasha / Eswatini and Namaacha / Mozambique
Travel
Intake at River Nile, Water Treatment Plant 10,000cum/day, Pumpstation, 71km DN 500 Transmission Main, 5,300cum Reservoir, 5 Elevated Tanks En-route, Rehabilitation of Drainage System, Landfill Site
Resident Engineer for pipe laying DI (23km DN 600), 27 chambers for AV/ WO/ BM/ Tee and installation of pumpstation (2 pump 550cum/h and height of 300m, 4 generators, surge vessel, etc.)
Resident Engineer for Pipe Laying DI (27km DN 400, 52km DN 500), construction of 200 chambers for AV/ WO/ BM and construction of 2 concrete reservoirs (2500cum and 5000cum)
Resident Engineer for several projekts: (1) June 2009 - May 2010: pipe laying works (DN 200/300/400 GRP and OD 160/ 110/ 90 HDPE) in Jalalabad, Metharlam, Charikar (2) Jan 2010 - Oct 2015: pipe laying works (11km DN 200-700 DI) and rehabiltation of 3 reservoirs in Kabul (3) Oct 2010 - Oct 2015: pipe laying works (200km OD25-450 HDPE) and 5000 house connections (3/4" -2") in Kabul