Jörg Schmidt

Project Engineer and Manager at FERCHAU Aviation Group

Hamburg, Hamburg, Germany

About

04/16 – present Ferchau Aviation GmbH Project Manager/Focal Point 08/16 – 08/20 Version engineer for A350 Galleys / Focal point for Rebuild docu-mentation • Realization and optimization of the change process for Airbus supplier on design improvements and corrections - Change evaluation and classification - EDES process (ABD100.2.9) - Design management - Documentation updates (system drawings, EWO-VD, DDP etc.) - Proof reading and validation of supplier deliverables - Coordination of supplier documentation for Airbus (VT3, ICC, SAP etc.) • Coordination of the design task and deliverables with the supplier in accordance with milestone planning - Drumbeat for outstanding supplier documentation - Priority setting of design changes and corresponding documentation - Escalation process in case of delays of deliverables • Onside Support for the supplier Collins Aerospace to ensure change process conformities within design and production - Trainings on the end to end change process (EDES, CSM, JCR etc.) - Workshops for internal improvements of supplier processes regarding lead time reductions and quality improvements - Support of process improvements to ensure process conformity (TDCA audit, EASA findings etc.) 12/07 – 03/16 Elan-Ausy GmbH - Design Engineer for Cabin interior / Focal Point and Project manager for ATA25-26 and ATA25-60 • Technical lead of a team for realization of design solutions on curtain systems, partitions and emergency equipment within the Airbus Long Range program - Creation of design solutions with the End to End change process - Project management and focal point (milestone planning, prioritizations, design management, cost and claim management) - Technical team lead functions to ensure effective usage of re-sources • Offer management and calculation on regularly call for tender for Air-bus work packages - Improvement planning for cost reductions of new offer - Calculation of cost impacts - Creation of offer documentation and presentation - Supportting the procurement team during the negotiation pro-cess with Airbus • Initiation of an offshore process for cost reductions - Development of processes for knowledge transfer, cooperation and information sharing - Modification of the design process to implement the offshore part in the end to end design process effectively - Creation of a tracking system to ensure on time deliveries ac-cording to the milestone planning

Experience

  • Modul Engineer F2F at FERCHAU
    Apr 2025 - Present · 1 yr 3 mos

  • Module Engineer for Cabin Floor to Floor A320 at Airbus
    Apr 2022 - Mar 2025 · 3 yrs

    Module Engineer for equipment development for A320 - Project focal for entrance area - Change management - Supplier management - Planning and contolling

  • FERCHAU Aviation Group (Full-time · 2 yrs 8 mos)
    • Project Engineer and Manager
      Sep 2020 - Mar 2022 · 1 yr 7 mos

      Realization and ccordination of different customer projects for a manufactorer of wind turbines - Planning and realization of change and config management - Support for improved process management - Optimization of communication streams

    • Version engineer for the A350 Galley / Focal point for Rebuild documentation
      Aug 2019 - Aug 2020 · 1 yr 1 mo

       Support for the Galley rebuilds change process and documentation - Proof reading and validation of supplier deliverables (EDES, System drawing, DDP etc.) - Coordination of supplier documentation for Airbus (VT3, ICC, SAP etc.)  Supporting Airbus supplier regarding rebuild documentation in accordance with the milestone planning - Drumbeat for outstanding supplier documentation - Priority setting of design changes and corresponding documentation - Escalation process in case of delays of deliverables - Training on process and design improvements for supplier engineering

  • Version engineer for A350 Galleys / Focal point for Rebuild documentation (temporary worker) at Airbus
    Aug 2016 - Jul 2019 · 3 yrs

     Realization and optimization of the change process for Airbus supplier on design improvements and corrections - Change evaluation and classification - EDES process (ABD100.2.9) - Documentation updates (system drawings, EWO-VD, DDP etc.) - Proof reading and validation of supplier deliverables - Coordination of supplier documentation for Airbus (VT3, ICC, SAP etc.)  Coordination of the design task and deliverables with the supplier in accordance with milestone planning - Drumbeat for outstanding supplier documentation - Priority setting of design changes and corresponding documentation - Escalation process in case of delays of deliverables  Support for the supplier to ensure change process conformities within design and production - Trainings on the end to end change process (EDES, CSM, JCR etc.) - Workshops for internal improvements of supplier processes regarding lead time reductions and quality improvements - Support of process improvements to ensure process conformity (TDCA audit, EASA findings etc.)

  • Design engineer for cabin interiors cross program of Airbus A/C family at FERCHAU Aviation Group
    Apr 2016 - Jul 2016 · 4 mos

     Realization and optimization of the change process for Airbus supplier on design improvements and corrections - Change evaluation and classification - EDES process (ABD100.2.9) - Documentation updates (system drawings, EWO-VD, DDP etc.) - Proof reading and validation of supplier deliverables - Coordination of supplier documentation for Airbus (VT3, ICC, SAP etc.)  Coordination of the design task and deliverables with the supplier in accordance with milestone planning - Drumbeat for outstanding supplier documentation - Priority setting of design changes and corresponding documentation - Escalation process in case of delays of deliverables  Support for the supplier to ensure change process conformities within design and production - Trainings on the end to end change process (EDES, CSM, JCR etc.) - Workshops for internal improvements of supplier processes regarding lead time reductions and quality improvements - Support of process improvements to ensure process conformity (TDCA audit, EASA findings etc.)