  • Quality Engineer at Invenergy LLC
    Sep 2021 - Present · 4 yrs 10 mos

    Electrical support for engineers & managers in battery storage, solar, and wind energy projects • Reviewed engineering data from milestones throughout multiple project lifecycles to assess design quality and develop improvements to specifications and work processes • Facilitated access to engineering standards, procurement resources, and construction quality records to promote knowledge sharing and continuous improvement within the renewable energy industry

  • Instrumentation Field Engineer - South Field Energy Project at Bechtel Power
    Aug 2020 - Jun 2021 · 11 mos

    Advanced Power EPC contract for a 1,182 MW Combined-Cycle Gas Plant (Wellsville, OH) • Replaced prior field engineer on short-notice to mobilize the instrumentation team in time to support scheduled system completions and project milestones • Supported union pipefitter & electrician crews by organizing engineering data into workable packages, procuring work materials, and coordinating tasks between multiple trades on-site

  • Controls Designer - NASA Mobile Launcher 2 Project at Bechtel Nuclear, Security & Environmental, Inc.
    Apr 2020 - Aug 2020 · 5 mos

    Bechtel project with Kennedy Space Center to build a launch unit for future rockets (Houston, TX - Remote) • Designed elements in the sensor data acquisition subsystem for analyzing launch conditions • Revised instrumentation block diagrams and I/O schematics from the ML1 project to support design changes in various control systems

  • Bechtel Oil, Gas, & Chemicals (Full-time · 5 yrs)
    • Electrical Engineer - Port Arthur LNG Project
      Oct 2019 - Apr 2020 · 7 mos

      Bechtel project with Sempra Energy to develop an LNG plant (Houston, TX) • Updated ETAP plant model and generated load flow & short-circuit calculations used for sizing transformers and emergency generators • Managed databases of electrical & industrial loads in various analysis software programs

    • Electrical Field Engineer - Hanford Waste Treatment Plant
      Oct 2016 - Oct 2019 · 3 yrs 1 mo

      Bechtel project with the Department of Energy to construct a nuclear waste neutralization facility (Richland, WA) • Progressed site systems to a condition suitable for start-up, while ensuring proper documentation and compliance with national standards & project procedures • Supported electricians by managing data for daily tasks, ordering materials, conducting work quality inspections, reporting deficiencies, facilitating design changes

    • Distribution Designer - Florida Power & Light Storm Hardening Project
      May 2015 - Sep 2016 · 1 yr 5 mos

      Bechtel project with Florida Power & Light to upgrade grid resilience during disasters (Frederick, MD - Remote) • Applied electrical and structural analysis tools and Geographic Information System software to develop design layouts and material estimates for smart grid development • Facilitated technical discussions / presentations across engineering disciplines