Josephina Braun

Looking for new challenges

Madrid, Community of Madrid, Spain

About

Experience

  • Production Scheduler at Johnson & Johnson
    Jul 2017 - Jun 2019 · 2 yrs

    ♦ Updating and maintaining the actual production status (1-13 weeks horizon) in local scheduling tools ♦ Ensuring an optimized production schedule for the packaging lines in accordance to the latest customer demands and available capacity as well as downstream replenishment requirement ♦ Identify and manage short term exceptions and supply constraints such as lack of raw materials, unplanned equipment downtime or quality issues ♦ Manage and ensure timely implementation of product changes, collaborate and partner with operations to ensure accurate bill of materials switch dates and timely update product of specific production parameters (recipe times, line efficiency) ♦ Accountable for downstream replenishment and timely release for production of packaging and intermediate components ♦ Following existing GMP standards

  • Master Thesis Student Production Planning and Control at ebm-papst Group
    Mar 2016 - Aug 2016 · 6 mos

    Master Thesis within Production Planning and Scheduling department Capacity Planning and Levelling in electronics industry ♦ Production process of semiconductors ♦ Review and redesign of KPIs for monitoring production performance ♦ Unterstand long-term production planning process and capacity rough cut planning with various manufacturing steps ♦ Identify root causes for instable forecast and capacity requirements ♦ SAP ERP queries and analysis of order related data ♦ Identify root causes for long lead times and low OTIF ♦ Derive measures for optimization within production/shopfloor and the planning department Master-Thesis in der PPS-Abteilung Auftragslogistik Thema: Kapazitätsplanung und Nivellierung in der Elektronikfertigung ♦ Produktionsprozesse in der Leiterplattenfertigung ♦ Kennzahlen zur Überwachung der Produktionsleistung und Planungsprozesse ♦ Kapazitätsplanungsprozess über mehrere Fertigungsstufen darstellen ♦ Ermitteln der Schwankungsursachen in der Produktionsplanung ♦ Identifizieren der Wirkungszusammenhänge und Einfluss auf die Termintreue ♦ Abfragen in SAP, Analyse von Auftragsdaten ♦ Ansätze zur Verbesserung der Planungsqualität und Zielerreichung der Fertigungssteuerung ♦ Ableiten geeigneter Kennzahlen

  • Summer intership Logistics and Transport at Stadler
    Jul 2015 - Sep 2015 · 3 mos

    ♦ Implementation of new concept for national and international transports ♦ Review / Monitoring of transport and toll costs ♦ Contacting and informing suppliers about new concept ♦ Designing and conduct database queries (infor ERP-system) ♦ Umsetzen des neuen Konzepts für in- und ausländische Transporte ♦ Kontrolle der Transport- und Zollkosten ♦ Informationsaustausch mit Speditionen ♦ Kontaktieren von Lieferanten ♦ Datenbankabfragen

  • N3 Engine Overhaul Services GmbH & Co KG (Arnstadt, Thüringen)
    • Bachelor Thesis Student Production Planning and Output Control
      Apr 2014 - Jul 2014 · 4 mos

      Thesis (B.Sc) within the planning department Process analysis and redesing of repair process during engine overhaul regarding an optimized process flow ♦ Process flow analysis using Swimlane-diagramme ♦ Identification of interfaces (tasks and tools) ♦ Evaluate potential of optimization ♦ Interviews with involved department responsibles ♦ Evaluate technical feasibility / practicability ♦ Develop implementation plan for new process Abschlussarbeit (B.Sc) in der PPS- Abteilung Output Control Prozessanalyse und Konzeption eines optimierten Ablaufs für einen spezifischen Reparaturprozess während der Triebwerkswartung ♦ Prozessflussanalyse mit Swimlane-Diagramm ♦ Schnittstellenidentifikation ♦ Verbesserungsmöglichkeiten evaluieren ♦ Koordination von Treffen und Absprache mit involvierten Abteilungen ♦ technische Umsetzbarkeit prüfen ♦ Maßnahmenplan aufstellen

    • Trainee Production Support Overhaul Engineering
      Oct 2013 - Apr 2014 · 7 mos

      ♦ Creation of technical customer reports ♦ Research and prepare components' histories ♦ Insight into complete overhaul process within MRO environment of Rolls Royce engines ♦ Erstellen der technischen Kundenreports (EN) ♦ Recherchieren und Aufstellen von Teilehistorien

  • Internship R&D - Engineering Process Transfer at Bosch Solar Energy
    Mar 2012 - Jul 2012 · 5 mos

    Internship in the R&D department for solar modules ♦ Support of the development process of a new PV module type ♦ Tests and analysis of the new production processes for optimized parameter setting (DoE, statistics) ♦ Development of the new stringing and laser process for solar cells ♦ Patent research of existing string types / interconnection technologies for increased cell efficiency ♦ Untersützung bei der Entwicklung eines neuen Modultyps ♦ Maßnahmen zur Vorbereitung auf die Kleinserienfertigung ♦ Versuchsdurchführungen (DoE) und Datenanalyse ♦ Patentrecherche zu strukturierten Zellverbindern