Joris Tuink

Technical Manager bij Tepsa Netherlands

Tepsa Netherlands

About

Experience

  • Technical Manager at Tepsa Netherlands
    Jan 2020 - Present · 6 yrs 10 mos

  • Vopak (12 yrs 1 mo)
    • Maintenance Manager
      Jun 2016 - Jan 2020 · 3 yrs 8 mos

      Led maintenance, inspection and modification activities across multiple operational tank terminals, with a strong focus on safety, reliability, compliance and operational continuity. Key achievements and scope: • Managed an annual Maintenance and Repair OPEX budget exceeding €8 million. • Led a multidisciplinary maintenance organization with 20 direct reports. • Redesigned the maintenance organization by separating operational priority response from planned maintenance, establishing dedicated teams for rapid failure resolution and preventive maintenance and inspections. • Managed contractors and technical service providers, focusing on safety, quality, cost and performance. • Contributed to organization-wide Lean initiatives focused on process optimization, efficiency improvement and cost reduction.

    • Maintenance Manager
      Oct 2009 - Jun 2016 · 6 yrs 9 mos

      Led maintenance, inspection and modification activities across two operational tank terminals, with a strong focus on safety, reliability, compliance and cost control. Key achievements and scope: • Integrated two maintenance organizations into one unified and more efficient organization, leading a team of 12 direct reports. • Managed an annual Maintenance and Repair OPEX budget of approximately €4 million. • Managed pipeline inspection programs and related sustaining CAPEX activities. • Led the implementation of a new maintenance management system. • Implemented the interface between the maintenance management and finance systems, strengthening financial control and process integration. • Drove efficiency, cost control and continuous improvement within the maintenance organization.

    • Manager Technical Department
      Jan 2008 - Oct 2009 · 1 yr 10 mos

      Led the Technical Department, covering tank maintenance, engineering, project execution and sustaining CAPEX. Key achievements and scope: • Managed an annual sustaining CAPEX portfolio of approximately €2 million. • Managed technical modifications and sustaining CAPEX projects from engineering through execution and implementation. • Drove improvements in asset integrity, reliability, safety and operational performance.

  • AVR (9 yrs)
    • Project Engineer
      Mar 2006 - Jan 2008 · 1 yr 11 mos

      Managed multidisciplinary CAPEX projects and technical modifications within an operational process environment. Key achievements and scope: • Managed Fluor as EPC contractor for large-scale CAPEX projects with budgets of up to €3 million. • Led multidisciplinary Technical Department teams and software engineers for fast-track projects with budgets of up to €1 million. • Managed hardware and software modifications from design and engineering through execution, commissioning and handover.

    • Production Shift Supervisor
      Jun 2003 - Mar 2006 · 2 yrs 10 mos

      Led the daily operation and performance of industrial Water Treatment Facilities within a continuous production environment. Key achievements and scope: • Managed daily operations covering Reverse Osmosis, Multi-Effect Distillation, wastewater incineration and wastewater treatment with molybdenum recovery. • Coordinated production activities, shutdowns and test runs with Technology, Maintenance and Project departments. • Managed operational priorities to ensure safe, reliable and continuous plant operation. • Maintained operational interfaces with industrial customers including Lyondell, Shell and Evides.

    • Process Engineer
      Feb 1999 - Jun 2003 · 4 yrs 5 mos

      Focused on commissioning, optimization and improving the capacity and reliability of newly constructed Water Treatment Facilities. Key achievements and scope: • Participated in the start-up and commissioning of the new process plant (water Treatment). • Performed troubleshooting and debottlenecking to improve capacity, performance and reliability. • Contributed to a multidisciplinary task force focused on maximizing plant capacity and operational reliability. • Developed technical modifications and supported acceptance, commissioning and start-up of new and modified installations. • Contributed to the redesign and implementation of sulfuric acid reactors and associated piping systems.